damon
11-05-08, 06:43 PM
Just spent the last few days with Terry Ferentinos who is on a Texas (& eastward as he heads home for Atlanta) calibration tour.
We did not have the easy set-up that we both had hoped for but with quite a bit of perserverance, & some parts luck I think Terry acheived an awesome image.
These 2 Ultras had run for 100+ hours on Terry's test bench so there was every expectation that they would do the same here in Dallas. A glycol leak & perhaps some other unforseen glitches conspired to make it a chore to get both up & running stable.
Luck was with us in some respects when we were able to source a Vertical Board locally in around 2 1/2 hours , then against us in that a damn Gekko climbed on the circuit board of the HVAC unit & forced us into 2 days of less than ideal conditions.
While I love the look of the Pininfarina covers I would be remiss not to admit that they were a pain in the ass for Terry to deal with.
All in all I think 4 1/2 days got the system to perform at a level that is exceedingly rare in HT video. Terry's patience played a large part in what I now see on the screen. He is very much the perfectionist & came back by today in a surprise appearance because he felt he could perhaps tweak in a bit more performance.
Don't let his forum persona let you think that he is comfortable only in conversing on all things video because we covered the gammut from Aviation (at one point the vast majority of onlookers were all pilots) to race cars & Poker. Terry has interesting experiences in all of these hobbies as well.
I promised some good screen shots so I will see what I can do!
thanks Terry!!!
Job well done!
nomad
We did not have the easy set-up that we both had hoped for but with quite a bit of perserverance, & some parts luck I think Terry acheived an awesome image.
These 2 Ultras had run for 100+ hours on Terry's test bench so there was every expectation that they would do the same here in Dallas. A glycol leak & perhaps some other unforseen glitches conspired to make it a chore to get both up & running stable.
Luck was with us in some respects when we were able to source a Vertical Board locally in around 2 1/2 hours , then against us in that a damn Gekko climbed on the circuit board of the HVAC unit & forced us into 2 days of less than ideal conditions.
While I love the look of the Pininfarina covers I would be remiss not to admit that they were a pain in the ass for Terry to deal with.
All in all I think 4 1/2 days got the system to perform at a level that is exceedingly rare in HT video. Terry's patience played a large part in what I now see on the screen. He is very much the perfectionist & came back by today in a surprise appearance because he felt he could perhaps tweak in a bit more performance.
Don't let his forum persona let you think that he is comfortable only in conversing on all things video because we covered the gammut from Aviation (at one point the vast majority of onlookers were all pilots) to race cars & Poker. Terry has interesting experiences in all of these hobbies as well.
I promised some good screen shots so I will see what I can do!
thanks Terry!!!
Job well done!
nomad