petee_c
12-15-08, 10:33 AM
It started like this:
http://www.pjbj.ca/uploaded_images/base1-791639.jpg
and is now looking like:
http://www.pjbj.ca/uploaded_images/IMG_1216_filtered-755336.jpg
It's a sound isolated, double drywalled, green glued, Kinetic Isomax Clipped, Hat Channelled, Stagger Studded or doublewalled 10 month creation. (No, I am not that slow, I worked on it for about 2 months, took 5 solid months off, and then worked on it in earnest for the past 3 months). I did all the work except for the carpet install.
The rough drawing of the plans is:
http://pjbj.ca/basementdrawing2.jpg
The last little details to be done are:
- box in lolly column with MDF
- buy some leather HT seating
- Blu Ray player (under the Xmas tree)
- permanent sound treatment panels, bass traps
- 2nd door to form an airlock
Details of the job are here: http://www.pjbj.ca/labels/basement.html
http://www.pjbj.ca/uploaded_images/base1-791639.jpg
and is now looking like:
http://www.pjbj.ca/uploaded_images/IMG_1216_filtered-755336.jpg
It's a sound isolated, double drywalled, green glued, Kinetic Isomax Clipped, Hat Channelled, Stagger Studded or doublewalled 10 month creation. (No, I am not that slow, I worked on it for about 2 months, took 5 solid months off, and then worked on it in earnest for the past 3 months). I did all the work except for the carpet install.
The rough drawing of the plans is:
http://pjbj.ca/basementdrawing2.jpg
The last little details to be done are:
- box in lolly column with MDF
- buy some leather HT seating
- Blu Ray player (under the Xmas tree)
- permanent sound treatment panels, bass traps
- 2nd door to form an airlock
Details of the job are here: http://www.pjbj.ca/labels/basement.html