WannaTheater
06-02-09, 03:15 PM
I received my preliminary drawings, and will soon be meeting with an A/C guy... who most likely has never done anything with isolation....
I live in Florida, and I have a heat pump (compressor is outside, air handler is in the garage or house). A/C gets used about 8 months of the year, heat anywhere from 1 week to at most 2 months (when needed). I will be adding a separate A/C for the theater space (27x15x10.5) and 2 adjoining rooms (grand total of new sq footage is about 850). The new air handler will be in the attic of addition (not above theater), compressor outside. Single thermostat will be used to control temp in all 3 rooms.
Does anyone have any pointers on how to bring A/C in the room from an isolation perspective? I am also looking for advice on size, number of supplies and returns, as well as supply/return placement.
Here is rough idea of ceiling (all air will originate from air handler in attic):
http://lh5.ggpht.com/_wbgOJLcX4qI/SiV1Svg5IDI/AAAAAAAACIc/hVCz6JkQBvU/s800/ceiling.jpg
I may do small cans in lower soffit, as well as crown on lower edge for rope light tray. I was thinking about just putting 2 supplies and 2 returns in the lower soffits, pointing down.
Anything I should be aware of? Thanks!
I live in Florida, and I have a heat pump (compressor is outside, air handler is in the garage or house). A/C gets used about 8 months of the year, heat anywhere from 1 week to at most 2 months (when needed). I will be adding a separate A/C for the theater space (27x15x10.5) and 2 adjoining rooms (grand total of new sq footage is about 850). The new air handler will be in the attic of addition (not above theater), compressor outside. Single thermostat will be used to control temp in all 3 rooms.
Does anyone have any pointers on how to bring A/C in the room from an isolation perspective? I am also looking for advice on size, number of supplies and returns, as well as supply/return placement.
Here is rough idea of ceiling (all air will originate from air handler in attic):
http://lh5.ggpht.com/_wbgOJLcX4qI/SiV1Svg5IDI/AAAAAAAACIc/hVCz6JkQBvU/s800/ceiling.jpg
I may do small cans in lower soffit, as well as crown on lower edge for rope light tray. I was thinking about just putting 2 supplies and 2 returns in the lower soffits, pointing down.
Anything I should be aware of? Thanks!