goblues38
03-09-07, 10:36 AM
http://webpages.charter.net/icemen/basement/a.jpg
5 year old house, already 4 bedrooms and 3 baths = 3,00 sq feet...adding anoth 1,0000 sq feet bedroom and bath in basement
http://webpages.charter.net/icemen/basement/b.JPG
This is the back wall of the main room looking towards the tv...bar on right...tv will be a sammy 61 inch dlp....i have a decent yamaha rxv2500 7.1 surround set up....the speakers up top are the yamaha pressence surrounds
http://webpages.charter.net/icemen/basement/c.JPG
To the left of the tv on the side walls we had to account for some plumbing that is ran inside the house (walk out basement) to keep the pipes from freezing. So we built it out 8 inches and are making a 4 or 5 shelf media rack.
http://webpages.charter.net/icemen/basement/d.JPG
Taken from back left corner of main room looking towards bar. the box is my righ surround location.
http://webpages.charter.net/icemen/basement/e.JPG
looking behind the bar at a pass thourgh we made so you can hand crock pot and junk through to bar as soon as you come down stairs.
http://webpages.charter.net/icemen/basement/f.JPG
Bartenders view of tv.
http://webpages.charter.net/icemen/basement/g.JPG
Arch treatment we gave my office.
http://webpages.charter.net/icemen/basement/h.JPG
Corner of the bar looking to back of room. noticve the furdown all the way to box out ac ducts. that lower ceiling carries all the way left so there is not just a drop down notch. it looks real sharp how we did it.
http://webpages.charter.net/icemen/basement/i.JPG
I added 8 drops into the box. we filled the holes up top so i had to hit the side of the box, mount a board ect ect.
http://webpages.charter.net/icemen/basement/j.JPG
8 port gigabit router, cable modem and cable distibution in closet to right of tv area
All this work took about 6 weeks. I am getting plumbing, electric, and fire safey inspection this monday....then i will start sound proofing, insulating, and drywalling.
Hope to have carpet and electronics installed by april 1.
5 year old house, already 4 bedrooms and 3 baths = 3,00 sq feet...adding anoth 1,0000 sq feet bedroom and bath in basement
http://webpages.charter.net/icemen/basement/b.JPG
This is the back wall of the main room looking towards the tv...bar on right...tv will be a sammy 61 inch dlp....i have a decent yamaha rxv2500 7.1 surround set up....the speakers up top are the yamaha pressence surrounds
http://webpages.charter.net/icemen/basement/c.JPG
To the left of the tv on the side walls we had to account for some plumbing that is ran inside the house (walk out basement) to keep the pipes from freezing. So we built it out 8 inches and are making a 4 or 5 shelf media rack.
http://webpages.charter.net/icemen/basement/d.JPG
Taken from back left corner of main room looking towards bar. the box is my righ surround location.
http://webpages.charter.net/icemen/basement/e.JPG
looking behind the bar at a pass thourgh we made so you can hand crock pot and junk through to bar as soon as you come down stairs.
http://webpages.charter.net/icemen/basement/f.JPG
Bartenders view of tv.
http://webpages.charter.net/icemen/basement/g.JPG
Arch treatment we gave my office.
http://webpages.charter.net/icemen/basement/h.JPG
Corner of the bar looking to back of room. noticve the furdown all the way to box out ac ducts. that lower ceiling carries all the way left so there is not just a drop down notch. it looks real sharp how we did it.
http://webpages.charter.net/icemen/basement/i.JPG
I added 8 drops into the box. we filled the holes up top so i had to hit the side of the box, mount a board ect ect.
http://webpages.charter.net/icemen/basement/j.JPG
8 port gigabit router, cable modem and cable distibution in closet to right of tv area
All this work took about 6 weeks. I am getting plumbing, electric, and fire safey inspection this monday....then i will start sound proofing, insulating, and drywalling.
Hope to have carpet and electronics installed by april 1.