Starbuck
04-15-07, 10:50 PM
I've just moved 40 4x8 and 45 4x12 sheets of sheetrock into my project room. I'm interested in seeing if there is anything I missed based on others experiences prior to closing the walls up. Here's what I have done so far:
1) Dedicated electrical to AV room
2) Dedicated electrical to FP
3) 7.2 speaker runs with two runs of RG6 for subs
4) HDMI, Component, VGA, S-Video, and Ethernet to FP
5) Graphik Eye for zone lighting.
6) Plywood above FP to secure current and future FP's
7) IR repeater wiring to front
8) Insulated
9) Sound insulation
10) 3in conduit from AV room to FP for future runs.
11) Inspections complete
Is there anything else I should check/install prior to closing it up? Was there anything you wish you had done (or had to open up a finished wall later)? Thanks.
1) Dedicated electrical to AV room
2) Dedicated electrical to FP
3) 7.2 speaker runs with two runs of RG6 for subs
4) HDMI, Component, VGA, S-Video, and Ethernet to FP
5) Graphik Eye for zone lighting.
6) Plywood above FP to secure current and future FP's
7) IR repeater wiring to front
8) Insulated
9) Sound insulation
10) 3in conduit from AV room to FP for future runs.
11) Inspections complete
Is there anything else I should check/install prior to closing it up? Was there anything you wish you had done (or had to open up a finished wall later)? Thanks.