rgathright
01-29-08, 08:08 PM
I received my projector and mount today. I am having trouble figuring it out.
First off I only see 3 mounting holes - is this correct? These holes are not centered in any way with the projector.
Secondly I can get the 3 brackets to fit with the bracket, but one of the adjustable feet is inside the bracket. Is this a problem?
After I get everything secured I assume the leveling of the projector is done via the adjustable feet. I assume this is done after attaching it to the threaded pipe hanging from the ceiling.
Any suggestions is greatly appreciated. I see now this will not be installed one evening after I get home from work. I need to allow a full day for the complete installation.
First off I only see 3 mounting holes - is this correct? These holes are not centered in any way with the projector.
Secondly I can get the 3 brackets to fit with the bracket, but one of the adjustable feet is inside the bracket. Is this a problem?
After I get everything secured I assume the leveling of the projector is done via the adjustable feet. I assume this is done after attaching it to the threaded pipe hanging from the ceiling.
Any suggestions is greatly appreciated. I see now this will not be installed one evening after I get home from work. I need to allow a full day for the complete installation.