Hi Gang,
Long time user of AVS forum and the members here have never sent me in the wrong direction. You've helped me install a theater in my first house, get all my components in the basement in my current house, hang plenty of TVs on thee walls, and will hopefully come along for the ride as I finish the basement in the next few months. Please feel free to chime in with ideas, ways to do things better, and just overall comments.
Planning to finish an area about 15' X 45' to house a pool table, general Theater/TV area, and a blank space for some bigger kid's toys. We'll put in a 10' X 10' half bath along with a 10' X 10' utility room. The lumber, foam sheathing (insulation R10), Roxul (safe and Sound) ceiling insulation, and moisture/mold resistant drywall have been ordered. Planning to get started in about two weeks.
My deadline to finish is fast approaching. My wife and I are expecting our second child in July....so the clock is ticking. If all goes well I can wrap it up by early June, which will give the carpet company a few weeks to install carpet before the due date. Couldn't do this project without my family. They rock!
Here's the basic floorplan.
Sketchup:
Before Pictures:
Current Media "Closet"
Long time user of AVS forum and the members here have never sent me in the wrong direction. You've helped me install a theater in my first house, get all my components in the basement in my current house, hang plenty of TVs on thee walls, and will hopefully come along for the ride as I finish the basement in the next few months. Please feel free to chime in with ideas, ways to do things better, and just overall comments.
Planning to finish an area about 15' X 45' to house a pool table, general Theater/TV area, and a blank space for some bigger kid's toys. We'll put in a 10' X 10' half bath along with a 10' X 10' utility room. The lumber, foam sheathing (insulation R10), Roxul (safe and Sound) ceiling insulation, and moisture/mold resistant drywall have been ordered. Planning to get started in about two weeks.
My deadline to finish is fast approaching. My wife and I are expecting our second child in July....so the clock is ticking. If all goes well I can wrap it up by early June, which will give the carpet company a few weeks to install carpet before the due date. Couldn't do this project without my family. They rock!
Here's the basic floorplan.
Sketchup:
Before Pictures:
Current Media "Closet"