Removing Fasteners after glue has set? - AVS | Home Theater Discussions And Reviews
Forum Jump: 
 
Thread Tools
Old 05-08-2012, 11:10 AM - Thread Starter
Member
 
noobzorta's Avatar
 
Join Date: Sep 2011
Posts: 39
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Liked: 10
Having just built a new sub box, i am not done finishing it totally. I would like to do a 1/4-1/2 fillet on the edges to round them over. However, i used 2in drywall screws in building this so i didn't have to drag the build out with clamping all the time. I used pl premium and the wood is the EFS mdf looking stuff.

Would i be able to pull the screws and plug the holes with filler so i would be able to router the edges? And still maintain structural integrity?
noobzorta is offline  
Sponsored Links
Advertisement
 
Old 05-08-2012, 11:14 AM
AVS Special Member
 
Brad Horstkotte's Avatar
 
Join Date: Dec 2005
Location: Torrance, CA
Posts: 5,131
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 14 Post(s)
Liked: 57
I haven't done it personally, but I've seen a number of experienced builders at the BFM forum that either pull the screws and fill after the PL has dried, or use brad nails instead of screws.
Brad Horstkotte is offline  
Old 05-08-2012, 11:47 AM
AVS Special Member
 
PassingInterest's Avatar
 
Join Date: Nov 2006
Location: Dallas, Tx
Posts: 1,761
Mentioned: 5 Post(s)
Tagged: 0 Thread(s)
Quoted: 50 Post(s)
Liked: 88
Yes, the screws just hold it together until the adhesive cures.

"Still, a man hears what he wants to hear and disregards the rest." --Paul Simon The Boxer
PassingInterest is online now  
 
Thread Tools


Forum Jump: 

Posting Rules  
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off