Over the new few weeks we'll be starting construction of our new home and am I interested in doing home automation for security (no motion sensors due to pets but likely door contacts), whole house audio (still debating between single and 6 zones), energy monitoring (circuit level and therm usage per appliance (if possible)), network connectivity, and remote control/notification options. Likely do a combination of hardwired and zigbee for communications with the attic and basements being accessible for the near-term.

Currently as it stands during construction I'll be pulling probably 24 to 36 cat6 drops with 3/4" smurf-tube just to be safe for future upgrades to a central closet in the basement. Overall looking to keep relatively cheap on the project with doing everything myself.

In looking at things for future planning
1) Does 110v power need to be run anywhere outside of the main distribution point?
2) What should be done up-front before the drywall gets put up? (cabling?, just plan with smurf-tube, if so where?)
zgamer is offline  
Sponsored Links
Advertisement
 
post #2 of 3 Old 11-04-2011, 04:59 AM - Thread Starter
Newbie
 
zgamer's Avatar
 
Join Date: Nov 2006
Location: WI
Posts: 11
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Liked: 10
So I'm taking it that during construction doesn't matter, anything can be retrofit?
zgamer is offline  
post #3 of 3 Old 11-04-2011, 06:52 AM
AVS Special Member
 
Neurorad's Avatar
 
Join Date: Sep 2007
Location: Give a monkey a brain...
Posts: 5,071
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 6 Post(s)
Liked: 79
hehe

If you're considering future video distribution via HDMI, I'd bump the size of the flex conduit up a little bit to accomodate large HDMI connectors, at least to the display locations.

I think motion sensors should be reconsidered, as pet-immune motions are better than they used to be.

Water/flood sensors may be useful in 10 years.

You'll need 110v outlets at the TVs.

DIY Prewiring is a big challenge, without any experience. Do your homework. Cocoontech forums are a good resource.

Believe nothing, no matter where you read it, or who said it, no matter if I have said it, unless it agrees with your own reason and your own common sense. -Buddha

Give a monkey a brain and he'll swear he's the center of the universe. -Fishbone
Neurorad is offline  
Reply Home Automation

User Tag List

Thread Tools
Show Printable Version Show Printable Version
Email this Page Email this Page


Forum Jump: 

Posting Rules  
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off