Creekside Stone Cinema - AVS | Home Theater Discussions And Reviews
Baselworld is only a few weeks away. Getting the latest news is easy, Click Here for info on how to join the Watchuseek.com newsletter list. Follow our team for updates featuring event coverage, new product unveilings, watch industry news & more!


Forum Jump: 
 54Likes
Reply
 
Thread Tools
post #1 of 326 Old 04-06-2014, 04:33 PM - Thread Starter
Senior Member
 
24Changer's Avatar
 
Join Date: Jul 2010
Location: Kannapolis,NC
Posts: 327
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 83 Post(s)
Liked: 97
Creekside Stone Cinema

AFTER pictures




BEFORE
Well, I have finally started on the 2nd take of our theater room and want to first give Spaceman accolades for help with the design. He has roughly 15 hours of drawing time and 8 different studies and I am thankful for his time and input. It was definitely worth the investment to see the room on paper first. Here are few shots of the current room built in 2006 with current floor plan








Current equipment
Receiver 7.7
Sony BD player
Sharp XVZ3100 projector
SI 92" Solar screen 16:9
Klipsch RF series 7.1

and here are the plans for the 2nd






As you can see we are going to make some major changes. Removing the wall behind the 2nd row of seats, this will open it up another 2'+. Moving the entry door to the center of the room and the AV rack outside of the room with entry to that in the back right corner. I will need to build a utility closet in the hall outside the room. As well as building a false wall to house a 125" wide AT screen and adding a soffit

New equipment will consist of:
Receiver - currently Integra 50.5
DVD - Oppo 103 BD
Projector - Sony 55ES
UH480 lens
2.35 -120 AT screen - Falcon Screen
LCR - 1099
Surrounds/Rears - Volt 10's
Subs DIY - 2 - 18" Dayton drivers
Crown 1000 amps for the speakers
Peavey 750 amp for the subs



Today was the first day of demolition with some modest gains



Attached Images
   

Creekside Stone Cinema

Last edited by 24Changer; 01-07-2015 at 06:40 AM.
24Changer is offline  
Sponsored Links
Advertisement
 
post #2 of 326 Old 04-08-2014, 06:35 PM - Thread Starter
Senior Member
 
24Changer's Avatar
 
Join Date: Jul 2010
Location: Kannapolis,NC
Posts: 327
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 83 Post(s)
Liked: 97
The drop ceiling is now completely down and preparing for soffit construction

Question:
What has everyone done as far as assembly; are you using a nail gun or using screws and glue?
What is the preferred material; drywall or MDF and are you doubling up the drywall?

The soffit will cover the duck (cold air return for the far side of the upstairs) that runs down the left side of the room, as pictured.



The soffit needs to be 28" to cover the widest point of the duct. One concern is being able to find a low profile can light to install under the duct with out giving up to much ceiling height. The measurement is 8'9" to the bottom side of the duct. So I am thinking that, even @ 8' ceiling height I should be able to find a fixture that will work.

Also, should I fill the soffit with the R13 or hard foam board or leave open?

Creekside Stone Cinema
24Changer is offline  
post #3 of 326 Old 04-15-2014, 02:26 PM - Thread Starter
Senior Member
 
24Changer's Avatar
 
Join Date: Jul 2010
Location: Kannapolis,NC
Posts: 327
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 83 Post(s)
Liked: 97
the progress has been slower than I expected, but I consider planning to be progress. Room is totally gutted and will start reworking the electrical lay out and HVAC once I have a definite direction on the soffit. In the meantime, I have been looking at trim and wall color and carpet patterns.

Creekside Stone Cinema
24Changer is offline  
post #4 of 326 Old 04-15-2014, 02:48 PM
Advanced Member
 
7channelfreak's Avatar
 
Join Date: Jan 2012
Location: North Houston
Posts: 849
Mentioned: 8 Post(s)
Tagged: 0 Thread(s)
Quoted: 224 Post(s)
Liked: 160
Quote:
Originally Posted by 24Changer View Post

the progress has been slower than I expected, but I consider planning to be progress. Room is totally gutted and will start reworking the electrical lay out and HVAC once I have a definite direction on the soffit. In the meantime, I have been looking at trim and wall color and carpet patterns.

What are you wanting your color palette to be?
7channelfreak is offline  
post #5 of 326 Old 04-15-2014, 04:38 PM - Thread Starter
Senior Member
 
24Changer's Avatar
 
Join Date: Jul 2010
Location: Kannapolis,NC
Posts: 327
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 83 Post(s)
Liked: 97
Quote:
Originally Posted by 7channelfreak View Post

What are you wanting your color palette to be?
I like the Allen Roth "Clock Tower" for the chair rail down and the columns up to the soffit. (although I will be using Sherwin Williams paint) Not quite sure what I want to do with the top half. Thinking that I would do panels but have not picked out a color. Going for 1800's color.
http://images.lowes.com/product/converted/080047/080047977886lg.jpg

Maybe a rustic or washed purple. I don't know, I need to order up some cloth samples I guess


I like the gold panels, or what looks like gold, in the Grouse Theater. I am thinking that would look good against the brown.

Creekside Stone Cinema
24Changer is offline  
post #6 of 326 Old 04-18-2014, 06:10 PM - Thread Starter
Senior Member
 
24Changer's Avatar
 
Join Date: Jul 2010
Location: Kannapolis,NC
Posts: 327
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 83 Post(s)
Liked: 97
Steady it goes. Yesterday I removed all the electrical and the HVAC. In doing that created a little extra work out in the main room of the basement having to reestablish power to some of the light. But all is working again. Today, did not have much time to work on the room, however I was able to cut in the new doorway, tape off the dimensions of the screen and order the materials for the stage and the riser.

Tomorrow I hope to finish roughing in the entry way and frame up the old one.



Creekside Stone Cinema
24Changer is offline  
post #7 of 326 Old 04-20-2014, 08:44 PM
AVS Special Member
 
Spaceman's Avatar
 
Join Date: Nov 2009
Location: North Houston
Posts: 2,004
Mentioned: 5 Post(s)
Tagged: 0 Thread(s)
Quoted: 28 Post(s)
Liked: 117
Spaceman is offline  
post #8 of 326 Old 04-21-2014, 05:15 PM - Thread Starter
Senior Member
 
24Changer's Avatar
 
Join Date: Jul 2010
Location: Kannapolis,NC
Posts: 327
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 83 Post(s)
Liked: 97
Quote:
Originally Posted by Spaceman View Post

No turning back now! smile.gif

That's right. The only turning back will be turning this room back into a theater!

Creekside Stone Cinema
24Changer is offline  
post #9 of 326 Old 04-27-2014, 04:22 PM - Thread Starter
Senior Member
 
24Changer's Avatar
 
Join Date: Jul 2010
Location: Kannapolis,NC
Posts: 327
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 83 Post(s)
Liked: 97
Al little more progress this weekend. I was able to put 5/8 DW & GG on the underside of the first floor and insulate. My plan is to start hanging the OSB and DW on the ceiling this week.



Creekside Stone Cinema
24Changer is offline  
post #10 of 326 Old 05-04-2014, 05:26 PM - Thread Starter
Senior Member
 
24Changer's Avatar
 
Join Date: Jul 2010
Location: Kannapolis,NC
Posts: 327
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 83 Post(s)
Liked: 97
one step closer. I was not able to hang the OSB & DW but I was able to install the clips and channel. Hopefully I will be hanging the ceiling next weekend.
Attached Images
 

Creekside Stone Cinema

Last edited by 24Changer; 07-30-2014 at 02:30 PM. Reason: Added picture
24Changer is offline  
post #11 of 326 Old 05-09-2014, 06:02 PM - Thread Starter
Senior Member
 
24Changer's Avatar
 
Join Date: Jul 2010
Location: Kannapolis,NC
Posts: 327
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 83 Post(s)
Liked: 97
Just about finished with the first layer of OSB, I have one small piece in the corner I will install in the morning and then I can move to the GG & DW

Kudos to my wife for the second pair of hands, She has been a great help through out this...so far!
Attached Images
 

Creekside Stone Cinema

Last edited by 24Changer; 07-30-2014 at 02:26 PM. Reason: Added picture
24Changer is offline  
post #12 of 326 Old 05-10-2014, 05:22 PM - Thread Starter
Senior Member
 
24Changer's Avatar
 
Join Date: Jul 2010
Location: Kannapolis,NC
Posts: 327
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 83 Post(s)
Liked: 97
Busted but today and finished hanging the ceiling. 11' boards of drywall will make an honest man out of anybody. Everything now will be gravy compared to hanging DW on a ceiling.

Creekside Stone Cinema
24Changer is offline  
post #13 of 326 Old 05-15-2014, 08:22 AM - Thread Starter
Senior Member
 
24Changer's Avatar
 
Join Date: Jul 2010
Location: Kannapolis,NC
Posts: 327
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 83 Post(s)
Liked: 97
I see that some risers have vents in them, is it necessary? Is there a science on where the must be placed?

Creekside Stone Cinema
24Changer is offline  
post #14 of 326 Old 05-18-2014, 03:41 PM - Thread Starter
Senior Member
 
24Changer's Avatar
 
Join Date: Jul 2010
Location: Kannapolis,NC
Posts: 327
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 83 Post(s)
Liked: 97
A little more progress today. Thanks to Big and his soffit design, they went together in a snap and were easy to install on the ceiling.

Creekside Stone Cinema
24Changer is offline  
post #15 of 326 Old 05-26-2014, 06:53 PM - Thread Starter
Senior Member
 
24Changer's Avatar
 
Join Date: Jul 2010
Location: Kannapolis,NC
Posts: 327
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 83 Post(s)
Liked: 97




I was able to complete the stage over the long weekend as well as install a new catalytic converter on the Volvo. The plan this week is to order the DW for the soffits and start on the electrical. I want to say thanks to all of you that have posted your projects, your builds have been very helpful and I appreciate it. Thanks.

Creekside Stone Cinema
24Changer is offline  
post #16 of 326 Old 05-27-2014, 03:43 AM
Advanced Member
 
kmhvball's Avatar
 
Join Date: Mar 2014
Location: Mason, Ohio
Posts: 502
Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 197 Post(s)
Liked: 81
Quote:
Originally Posted by 24Changer View Post

I see that some risers have vents in them, is it necessary? Is there a science on where the must be placed?


There are are various threads on this... But typically the vents are for "bass trapping".  There seems to be some perception of 'science needed', and a few folks who say the pressure is at the 'outer walls', so, making the vents along the outside edges of the Riser.    I think you may need to have the 'stringer' boards be shallower than the outer edge boards of the platform.  

 

One of the threads had a person who was going to do some different testing to get an optimal set up, but haven't see the results of that yet.  

 

This thread has some pictures and lots of discussion on this..   http://www.avsforum.com/t/1527200/risers-101

kmhvball is offline  
post #17 of 326 Old 05-28-2014, 07:33 AM - Thread Starter
Senior Member
 
24Changer's Avatar
 
Join Date: Jul 2010
Location: Kannapolis,NC
Posts: 327
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 83 Post(s)
Liked: 97
Quote:
Originally Posted by kmhvball View Post


There are are various threads on this... But typically the vents are for "bass trapping".  There seems to be some perception of 'science needed', and a few folks who say the pressure is at the 'outer walls', so, making the vents along the outside edges of the Riser.    I think you may need to have the 'stringer' boards be shallower than the outer edge boards of the platform.  

One of the threads had a person who was going to do some different testing to get an optimal set up, but haven't see the results of that yet.  

This thread has some pictures and lots of discussion on this..   http://www.avsforum.com/t/1527200/risers-101

Thank you for the info. I was planning on having my stringers more shallow for multiple reasons and now I can add this to as well. I will definitely check out the link. ~ Thanks

Creekside Stone Cinema
24Changer is offline  
post #18 of 326 Old 06-01-2014, 03:37 PM - Thread Starter
Senior Member
 
24Changer's Avatar
 
Join Date: Jul 2010
Location: Kannapolis,NC
Posts: 327
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 83 Post(s)
Liked: 97
Another weekend, another step closer to completion. The electrical is roughed in, the riser is started and DW is about finished. I am waiting for the LED can lights to arrive, I ordered them from Destination Lighting.
http://www.destinationlighting.com/item/dimmable-14-watt-led-6-inch-recessed-lighting-kit-case-pack-6/437586

Looking forward to the lights arriving so I can wrap up DW installation, it is not one of my favorite things to do.


Creekside Stone Cinema
24Changer is offline  
post #19 of 326 Old 06-01-2014, 06:00 PM - Thread Starter
Senior Member
 
24Changer's Avatar
 
Join Date: Jul 2010
Location: Kannapolis,NC
Posts: 327
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 83 Post(s)
Liked: 97
Hey if anyone has any suggestions or if any of the pictures provoke questions, feel free to chime in. This project surely has been a great learning experience, especially with the process in which things are completed. I am enjoying it but when it is completed, I don't know if I want to do it again right away, but with experience, everything becomes easier.

Creekside Stone Cinema
24Changer is offline  
post #20 of 326 Old 06-03-2014, 01:35 AM
AVS Special Member
 
DavidK442's Avatar
 
Join Date: Apr 2010
Location: British Columbia, Canada
Posts: 1,436
Mentioned: 1 Post(s)
Tagged: 1 Thread(s)
Quoted: 252 Post(s)
Liked: 159
The wider, acoustically transparent screen will give you a totally new, more immersive experience. Personally, I think the 1:1 viewing ratio for scope movies that you will now enjoy is about perfect.
Add to that the aesthetic improvements, and it is like you are getting an entirely new build for a fraction of the cost and effort.
Just one comment/concern...won't the 2.5' from entry to chair back seem rather cramped? Perhaps a small price to pay for the overall improvement.

What a great project. I will have to hang around to see how it all turns out.
DavidK442 is offline  
post #21 of 326 Old 06-04-2014, 11:45 AM - Thread Starter
Senior Member
 
24Changer's Avatar
 
Join Date: Jul 2010
Location: Kannapolis,NC
Posts: 327
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 83 Post(s)
Liked: 97
Quote:
Originally Posted by DavidK442 View Post

The wider, acoustically transparent screen will give you a totally new, more immersive experience. Personally, I think the 1:1 viewing ratio for scope movies that you will now enjoy is about perfect.
Add to that the aesthetic improvements, and it is like you are getting an entirely new build for a fraction of the cost and effort.
Just one comment/concern...won't the 2.5' from entry to chair back seem rather cramped? Perhaps a small price to pay for the overall improvement.

What a great project. I will have to hang around to see how it all turns out.


Thanks for stopping by David. Really looking forward to the "immersion"

Not sure how cramped the entry will feel, hopefully not too bad. I do not do much hosting and after a while I will grow accustom to it. I'll be sure to post when finished how it turns out.

Creekside Stone Cinema
24Changer is offline  
post #22 of 326 Old 06-08-2014, 04:04 PM - Thread Starter
Senior Member
 
24Changer's Avatar
 
Join Date: Jul 2010
Location: Kannapolis,NC
Posts: 327
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 83 Post(s)
Liked: 97
Not much progress made this weekend, however I was able to start roughing in the wiring in the riser, 4 light boxes in, 4 to go. Riser is 90% complete, just need to finish the front steps to the 1st row. Also ran 2" conduit from front to back, finished patching all the old speaker wire locations around the room and move the 2 outlets on the front wall 1' further towards the center of the room so that the corner bass traps would not cover them up.

Creekside Stone Cinema
24Changer is offline  
post #23 of 326 Old 06-10-2014, 04:52 PM - Thread Starter
Senior Member
 
24Changer's Avatar
 
Join Date: Jul 2010
Location: Kannapolis,NC
Posts: 327
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 83 Post(s)
Liked: 97
Lights arrived yesterday, so, of course I went right to work.


The back 6 lights are up.


I took Spaceman's advice and the front lights closest to the stage will be on their own switch. That way I will be able to have the back lights on at a low level without affecting the picture on the screen from the front lights casting light onto the screen.

The cans fit in nicely under the cold air return for the upstairs...

Creekside Stone Cinema
24Changer is offline  
post #24 of 326 Old 06-15-2014, 05:28 PM - Thread Starter
Senior Member
 
24Changer's Avatar
 
Join Date: Jul 2010
Location: Kannapolis,NC
Posts: 327
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 83 Post(s)
Liked: 97
Another weekend, another step closer to enjoyment. We finished the electrical in the riser, stuffed it with the fluffy and 2 layers of OSB with GG. It is nice crossing "to do's" of the list.


Will post pictures once I figure it out.

Last edited by 24Changer; 06-16-2014 at 05:29 AM.
24Changer is offline  
post #25 of 326 Old 06-16-2014, 07:22 AM - Thread Starter
Senior Member
 
24Changer's Avatar
 
Join Date: Jul 2010
Location: Kannapolis,NC
Posts: 327
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 83 Post(s)
Liked: 97
DSCN1449.jpg
DSCN1446.jpg
DSCN1447.jpg

Some pic's of the riser
Attached Images
     
24Changer is offline  
post #26 of 326 Old 06-16-2014, 09:49 AM
Member
 
Join Date: Jun 2014
Location: Ellicott City, MD
Posts: 87
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 41 Post(s)
Liked: 6
Thanks for taking the time to document your build. There's some good and bad there:
Good:
- Your retro looks very similar to one I'm planning on doing, and I appreciate the play by play
- LOVE your risers, wish I could incorporate them into my design!!
Bad:
- That link to Destination Lighting may end up costing me...
DougUSMC is offline  
post #27 of 326 Old 06-18-2014, 07:00 AM - Thread Starter
Senior Member
 
24Changer's Avatar
 
Join Date: Jul 2010
Location: Kannapolis,NC
Posts: 327
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 83 Post(s)
Liked: 97
Quote:
Originally Posted by DougUSMC View Post
Bad:
- That link to Destination Lighting may end up costing me...



Thanks Doug. The lights are working well and were the least expensive ones I found.
24Changer is offline  
post #28 of 326 Old 07-06-2014, 03:16 PM - Thread Starter
Senior Member
 
24Changer's Avatar
 
Join Date: Jul 2010
Location: Kannapolis,NC
Posts: 327
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 83 Post(s)
Liked: 97
It was back to work this weekend after a few weeks off, our male dog Kooper passed on June 20th and it really wiped my ambition out.


so this weekend I finished installing the lights fixtures, stuffed the soffits with insulation and hung the DW on them. HVAC guys are scheduled to be here in the AM to install the supplies and the cold air return and then I will put the last of the DW up on the back soffit.
Attached Images
     
24Changer is offline  
post #29 of 326 Old 07-17-2014, 06:03 AM - Thread Starter
Senior Member
 
24Changer's Avatar
 
Join Date: Jul 2010
Location: Kannapolis,NC
Posts: 327
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 83 Post(s)
Liked: 97
Last week the HVAC was completed, 2 supplies & 1 cold air return . The 2 supplies are 6" runs with a 4x10" box and the return is 14"x14"
Attached Images
   

Last edited by 24Changer; 07-17-2014 at 06:26 AM.
24Changer is offline  
post #30 of 326 Old 07-17-2014, 06:24 AM - Thread Starter
Senior Member
 
24Changer's Avatar
 
Join Date: Jul 2010
Location: Kannapolis,NC
Posts: 327
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 83 Post(s)
Liked: 97
Today the guys are here to tape & mud the seems. My goal is to primer the walls & ceiling by the end of the weekend.


1 of the changes I made to the original plan was to move the equipment rack to the closet adjacent to the theater entrance. This will keep me from having a large hole on the back wall and the added expense of soundproofing it. So what I did was replace the 24" door with 28" door so that I could roll the AV rack n there and the Dwallers will tape & mud that today as well.
Attached Images
 
Naylorman32 likes this.
24Changer is offline  
Sponsored Links
Advertisement
 
Reply Dedicated Theater Design & Construction



Forum Jump: 

Posting Rules  
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off