I think I know the answer already frown.gif but do I need sand in both sections of my stage?



Here is the full stage - The top is not attached yet.



I fear hauling that many bags into the basement will kill me eek.gif
smiddleton5401 is offline  
Sponsored Links
Advertisement
 
Old 04-12-2014, 06:47 PM
HOME THEATER CONTRACTOR
 
BIGmouthinDC's Avatar
 
Join Date: Jan 2003
Location: Northern VA
Posts: 21,499
Mentioned: 10 Post(s)
Tagged: 1 Thread(s)
Quoted: 575 Post(s)
Liked: 738
Obviously the part of the stage where the speakers sit is the top priority. If your body isn't willing to fill the rest than you do what you can, fill with insulation. Are you going to carpet the stage?, if yes you should have a lip and it can be added after the fact.

Last comments, you should drywall the room before building the stage and risers, trust me it is easier and better for sound containment. Be sure the stage doesn't touch or is otherwise connected to the rooms framing. Also best practice is to put a barrier between concrete walls/floors and untreated lumber. I see regular plywood sitting on the floor. I would put down a layer of roofing felt.
BIGmouthinDC is online now  
Old 04-12-2014, 06:59 PM
HOME THEATER CONTRACTOR
 
BIGmouthinDC's Avatar
 
Join Date: Jan 2003
Location: Northern VA
Posts: 21,499
Mentioned: 10 Post(s)
Tagged: 1 Thread(s)
Quoted: 575 Post(s)
Liked: 738
I looked at your pictures again, you are planning to build some walls aren't you?, you need to frame them first. I don't see any room to frame the front wall.
BIGmouthinDC is online now  
Old 04-12-2014, 07:40 PM - Thread Starter
Member
 
smiddleton5401's Avatar
 
Join Date: Oct 2008
Posts: 26
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Liked: 10
Unfortunately, I had a novice helping me in the beginning. The stage is only a few inches from the rear wall (concrete). I was going to seek help on what to do for the front wall next. I wonder how to decouple it; wall attached to the stage top after filling it with sand while decoupling from the ceiling?

I wish I had this forum resource when I had the traditional framer follow the design:
smiddleton5401 is offline  
Old 04-12-2014, 07:45 PM - Thread Starter
Member
 
smiddleton5401's Avatar
 
Join Date: Oct 2008
Posts: 26
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Liked: 10
The stage is decoupled from the side walls but unfortunately it was set with construction adhesive to the concrete slab (no roofing felt underneath)
smiddleton5401 is offline  
Old 04-12-2014, 08:16 PM
HOME THEATER CONTRACTOR
 
BIGmouthinDC's Avatar
 
Join Date: Jan 2003
Location: Northern VA
Posts: 21,499
Mentioned: 10 Post(s)
Tagged: 1 Thread(s)
Quoted: 575 Post(s)
Liked: 738
Frankly I'd rip it out and start over, it is that bad. I doubt it is glued so tight a crowbar couldn't get the job done before the first coffee break. For one thing lets assume at some point you want to convert the room to another use, the wall is sitting on the stage? no way.
BIGmouthinDC is online now  
Old 04-12-2014, 08:24 PM - Thread Starter
Member
 
smiddleton5401's Avatar
 
Join Date: Oct 2008
Posts: 26
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Liked: 10
Ugg, I thought it might be that bad. I plan to stay in the house I built for my whole life so I want the theater done right. It's the only room I have left for me : ) The house full of girls (my wife and two daughters) took over everything else.

As close as you are to me, maybe you're looking for another client?
smiddleton5401 is offline  
Old 04-12-2014, 08:34 PM
HOME THEATER CONTRACTOR
 
BIGmouthinDC's Avatar
 
Join Date: Jan 2003
Location: Northern VA
Posts: 21,499
Mentioned: 10 Post(s)
Tagged: 1 Thread(s)
Quoted: 575 Post(s)
Liked: 738
I'm booked for a bit for hands on work but I do Skype consulting in the evenings.

Here is what the stage framing should generally look like.



another:




smiddleton5401 likes this.
BIGmouthinDC is online now  
Old 04-12-2014, 08:45 PM - Thread Starter
Member
 
smiddleton5401's Avatar
 
Join Date: Oct 2008
Posts: 26
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Liked: 10
Yeah, I see the shortcomings by comparison. I'm going to see if it can be disassembled to have it forward enough for a proper wall assembly with clips, GG, DD, etc

If you know of someone good near the Montgomery County Maryland area you work well with, let me know.
smiddleton5401 is offline  
Old 04-13-2014, 05:00 PM - Thread Starter
Member
 
smiddleton5401's Avatar
 
Join Date: Oct 2008
Posts: 26
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Liked: 10
Quote:
Originally Posted by BIGmouthinDC View Post

Frankly I'd rip it out and start over, it is that bad. I doubt it is glued so tight a crowbar couldn't get the job done before the first coffee break. For one thing lets assume at some point you want to convert the room to another use, the wall is sitting on the stage? no way.

I don't know much, but I've seen enough of his builds and advice to listen to BIG.


I fear I will have to move out and redo the rear riser as well:

smiddleton5401 is offline  
Old 04-13-2014, 05:13 PM
HOME THEATER CONTRACTOR
 
BIGmouthinDC's Avatar
 
Join Date: Jan 2003
Location: Northern VA
Posts: 21,499
Mentioned: 10 Post(s)
Tagged: 1 Thread(s)
Quoted: 575 Post(s)
Liked: 738
I would, that may not be tall enough anyway. Risers should have at least two layers of 3/4 decking (keep it quiet) and be filled with insulation. Built on roofing felt of course. unless those were Pressure treated sleepers.
BIGmouthinDC is online now  
Old 04-13-2014, 05:23 PM - Thread Starter
Member
 
smiddleton5401's Avatar
 
Join Date: Oct 2008
Posts: 26
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Liked: 10
Quote:
Originally Posted by BIGmouthinDC View Post

I would, that may not be tall enough anyway. Risers should have at least two layers of 3/4 decking (keep it quiet) and be filled with insulation. Built on roofing felt of course. unless those were Pressure treated sleepers.

They are 2x6's on top of pressure treated with about 1.5"- 2" of gap from any walls. I'm limited to the height of the platform coming off the steps leading into the theater from the other hallway. There is enough room for 2 layers of 3/4" decking though. The pictures only show temporary decking to move around; its not attached yet.
smiddleton5401 is offline  
Old 04-13-2014, 05:41 PM
HOME THEATER CONTRACTOR
 
BIGmouthinDC's Avatar
 
Join Date: Jan 2003
Location: Northern VA
Posts: 21,499
Mentioned: 10 Post(s)
Tagged: 1 Thread(s)
Quoted: 575 Post(s)
Liked: 738
Quote:
Originally Posted by smiddleton5401 View Post

I'm limited to the height of the platform coming off the steps leading into the theater from the other hallway.

Make it a two level riser, the entrance level and the seating area, use step lights if you plan on having guests.

I'd have to see the entrance maybe you could step up to the final level outside the theater first
BIGmouthinDC is online now  
Old 05-29-2014, 07:51 PM
Member
 
Cthanatos's Avatar
 
Join Date: Mar 2014
Location: SLC, UT
Posts: 54
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 4 Post(s)
Liked: 16

Why roofing felt? I've seen that elsewhere too, but what's the reason/science behind it? Also, how far away from the walls should stage be? Does the carpet and sand just keep it in place then?

Cthanatos is offline  
Old 05-29-2014, 08:19 PM
Senior Member
 
kmhvball's Avatar
 
Join Date: Mar 2014
Location: Mason, Ohio
Posts: 353
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 116 Post(s)
Liked: 50
Quote:
Originally Posted by BIGmouthinDC View Post

Make it a two level riser, the entrance level and the seating area, use step lights if you plan on having guests.

I'd have to see the entrance maybe you could step up to the final level outside the theater first

I am leaning towards a two level riser now as well... The first being the height of the last step into the basement, carried into the theater room. This will make for slightly more head room under soffits... The 2nd will be contained essentially inside the footprint if the initial riser to contain the 2nd row of seats at a higher height. The main riser, already being step height, would then step down to the first row floor level. I may still extend the ends of the riser to go past the rear of the first row.
kmhvball is offline  
Old 05-29-2014, 08:50 PM
Member
 
Cthanatos's Avatar
 
Join Date: Mar 2014
Location: SLC, UT
Posts: 54
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 4 Post(s)
Liked: 16

Answered my own question about the sand - 

 

 
Quote:
Quote:
3. 4 or 6 mil plastic in cavity and fill the the top with dry play sand.
Q. is the weight of the sand what actually keeps the floor in place in lieu of attaching it to the concrete?

More importantly it makes stage accoustically dead - no/little resonance from stage. But yes, my 12' x 4' x 6" stage has nearly half a ton of sand in it and it inst going anywhere. My stage is not that large.

Cthanatos is offline  
Old 05-29-2014, 09:42 PM
Member
 
Cthanatos's Avatar
 
Join Date: Mar 2014
Location: SLC, UT
Posts: 54
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 4 Post(s)
Liked: 16

Dennis menioned in a couple threads I've read 

 

Quote:
 Be sure your subwoofer(s) is (are) very firmly anchored to the platform.

 

How exactly would they be anchored? I keep thinking that I'll just end up setting my speakers on the carpet for the front, and others higher around the room.

Cthanatos is offline  
Old 05-30-2014, 04:45 AM
HOME THEATER CONTRACTOR
 
BIGmouthinDC's Avatar
 
Join Date: Jan 2003
Location: Northern VA
Posts: 21,499
Mentioned: 10 Post(s)
Tagged: 1 Thread(s)
Quoted: 575 Post(s)
Liked: 738
I've never read that instruction and I've never anchored a sub. I use gravity and the little knobby feet dig into the carpet. Another method is to put spike feet on the bottoms.
BIGmouthinDC is online now  
Old 05-30-2014, 03:32 PM
Member
 
Cthanatos's Avatar
 
Join Date: Mar 2014
Location: SLC, UT
Posts: 54
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 4 Post(s)
Liked: 16

Ok, that's what I was planning, but I couldn't for the life of me think he would mean to literally anchor it to the platform with screws and such. But it is Dennis, so I wanted to make sure I wasn't just being ignorant. Thanks BigmouthinDC!

Cthanatos is offline  
 
Thread Tools


Forum Jump: 

Posting Rules  
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off