SEATING
* FRONT ROW: 3 Curved Berkline 45003 Black Leather Motorized Recliners
* BACK ROW: 4 Curved Berkline 45003 Black Leather Motorized Recliners

SPEAKERS
* CENTER: M&K S-5000 THX
* FRONT LEFT/RIGHT: M&K S-5000 THX
* ATMOS TOP FRONT LEFT/RIGHT: M&K SS-150 THX
* ATMOS TOP REAR LEFT/RIGHT: M&K SS-150 THX
* SURROUND LEFT/RIGHT: M&K SS-150 THX
* BACK LEFT/RIGHT: M&K SS-150 THX
* SUB1: M&K MX-350 THX
* SUB2: HSU VTF-15H
* SUB 3 & 4: DIY Flat Pack Builds - Dayton Audio RSS460HO-4 18" Reference HO Subwoofer  4 Cubic Feet each

ROOM DIMENSIONS & MEASUREMENTS
* BEFORE WALLS: 27' Deep x 17'9" Wide (excludes theater foyer entryway)
* FINISHED ROOM AFTER SOUND PROOFING: 25'8" Deep x 16'9.5" Wide
* NOTES: The theater is being constructed in part of our unfinished basement. There is a 23" drop in the basement to allow for stadium seating.
* SHORTEST CEILING HEIGHT BEFORE CONSTRUCTION: 8'10"
* TALLEST CEILING HEIGHT BEFORE CONSTRUCTION in Drop Down area: 10'9"
* Front Row: 8'6" from Front of Seat to screen
* Back Row: 14'7" from Front of Seat to screen
* Projector: 16'2" from Lens to Screen
* Screen: 136" Wide 2.35
VIEWING DISTANCE TO BOTTOM OF SCREEN FROM CENTER FRONT ROW
* SEAT INCLINED: 10' 5 1/2"
* SEAT DECLINED: 11' 2"
 

EQUIPMENT
* RECEIVER: Denon X5200W, OLD: Denon AVR-4520CI (11.2), OLD: Onkyo NX-TR3008 (FOR SALE)
* AMP: Emotiva XPA-5 (Center, Front Left & Right, Side Surround Left & Right)
* AMP: Behringer EP4000 (2 Dayton Subs)
* AMP: (2) Dayton APA100 (Atmos Speakers Top Front & Top Rear inside Soffit)
* BLU-RAY PLAYER: Dune HD Max
* GAMING: PS3, (2) XBOX-360
* POWER CONDITIONER: Belkin PF60
* IMAGE PROCESSING: Darbee Darblet DVP5000
* STORAGE: Cinemar MLD-4000 12 TB Mass Storage Server
* PROJECTOR: Panasonic PT-AE8000U
* SCREEN: 136" Wide 2.35 AT Screen (Seymour AV)
* TABLET/iPAD/PHONE USER INTERFACE: Cinemar's MainLobby / MLServer / DVDLobby
* REMOTE CONTROL: Logitech Harmony 700
* LIGHTING CONTROL: Insteon via MainLobby
* THERMOSTAT CONTROL: Proliphix NT-20E Thermostat via MainLobby
* INTERCOM: Not sure yet - most likely go with Russound
 
CARPETING
* Masland Quadrate Times Square
 
FABRIC
* Red Walls - FR701 GOM Style 2100 (#418) Claret Accent Fabric
* Speaker Frames - FR701 GOM Style 2100 (#408) Black Fabric
* Top of Front Cabinet Below Screen & Sides of Vertical Front Cabinets Facing Screen - Protostar Self-Adhesive Flocked Light Trap Material
* Bordering Edges that the Seymour AV Screen sit's on - Black Triple Plush Velvet

SOUND PROOFING
The room above the theater is a nursery and office. One of the rooms next to the theater is a furnace room. So it's important to keep the sound out of the rooms above and prevent sound coming in from the furnace room.
Current plan of attack is to use two layers of 5/8" drywall and Green Glue with sound absorption clips. Staggered stud walls will be on any framed walls.
* Minimum 1-3/4" Solid Core Door with automatic door bottom.

PAINTED STAR CEILING
* Hand painted black light star ceiling painted by Night Sky Murals
 
VIRTUAL MOVIE POSTER
* A 40" LED TV mounted in Portrait displays the Cover Art of the currently movies along with statistics like: Number of Movies watched in theater, Minutes remaining of playing movies, movies coming soon, lbs of popcorn consumed, etc.  The user interface on the LED Movie Poster is powered by MainLobby.
 
BASS SHAKERS
Aura Pro Bass Shakers in Back Row (4 Chairs)

SOUND TREATMENT
Recycled Denim/ Titus EcoShield (1" x 4' x 50') (Bought from Vyron Corporation)

D-BOX MOTION PLATFORM
D-Box Motion Platform in Front Row (3 Chairs)


VIRTUAL (MATTERPORT) WALK-THROUGH OF CINEMAR HOME THEATER
https://my.matterport.com/show/?m=ur3p2q8Hk9r



UNFINISHED BASEMENT AREA


FINAL ATMOS SPEAKER PLACEMENT






MY ORIGINAL PROPOSED THEATER DESIGN (Top View)


MY ORIGINAL PROPOSED THEATER DESIGN (Side View)


LATEST THEATER DESIGN (Top View)


LATEST THEATER DESIGN (Side View - RESERVED)

LATEST THEATER DESIGN (3D View)







 
 
FABRICS, CARPET & PAINT INFORMATION

 
 
 
COMPOSITED 3D IMAGE WITH ACTUAL PHOTO [There is an angled divider.  The Left Upper Area is the actual photo, the right lower area is 3D]

 
FINAL ACTUAL PHOTO WITH NIGHT SKY MURAL STAR CEILING:

 
LED TV MOVIE POSTER DISPLAYS CURRENTLY PLAYING MOVIE AND ACTUAL START / END TIMES USING CINEMAR'S MAINLOBBY SOFTWARE

 
iPad Movie Selection using Cinemar Software. Also controls thermostat, lighting, projector, receiver and security.

 
THREAD INDEX
* 12.22.09 - Construction Thread Started
* 04.27.10 - Generac House Generator Installed
* 12.04.10 - Cleaned up 4 Miles of Cable in Media Rack
* 03.19.11 - Construction Lumber and Green Glue arrived, Reworked Sump Pump Area and Added Additional Breakers to Media Rack Closet
* 03.25.11 - 3D Renders of Rec Room Area outside Theater
* 03.27.11 - Framing of Interior Basement Walls Started
* 04.03.11 - Theater Framing Started, Foundation Injection Crack Repair Completed
* 04.16.11 - Illustration Showing Theater Construction using Whisper Clips, DC-04 Clips, Drywall and OSB
* 04.16.11 - Illustration Showing Theater Heating/Cooling Supply Sound Proofing
* 04.21.11 - 3D Wireframe Composite of Seats and Columns within Theater Shell
* 05.29.11 - Dead Vent Framed and Plumbing for Bar Sink Moved out of Theater
* 06.01.11 - Started Framing Soffits
* 06.04.11 - 3D Illustration of Clips and Channel Construction
* 06.06.11 - Started Framing Interior Theater Walls
* 06.08.11 - Raising the Sunken Concrete Floor Up
* 06.12.11 - Theater Room Wiring Diagram
* 06.12.11 - Suspended Sound Proofed Vent Muffler Diagram
* 06.15.11 - Started Construction of Vent Mufflers
* 06.19.11 - Ran Wiring for Speakers, Bass Shakers, Cat5 and Subs. Puddy Pads
* 06.23.11 - Can Light Backer Box Construction
* 06.23.11 - Initial Lighting Diagram
* 06.25.11 - Vent Muffler Installed using IB-3 Clips
* 06.26.11 - Corner Clamps, Acoustic Sealant, Network Thermostat Wired, R19 in Ceiling Started
* 06.29.11 - Speaker and Column Placement Diagram and Discussions
* 06.29.11 - Pipe Wrap on Vent Boots, IB-3 Clips on 2nd Vent Muffler, Instulating Vent Muffler
* 07.01.11 - 2nd Vent Muffler Installed into Soffit
* 07.01.11 - TIP: Whisper Clip Inside Corner Placement Diagram
* 07.03.11 - Hung Whisper Clips and Started Installed Hat Channel
* 07.05.11 - Sound Proofed Cold Air Return 1 and all Hat Channels Installed
* 07.07.11 - Sound Proofed Cold Air Return 2 - From the Inside of the Cold Air Return
* 07.11.11 - Tips and Tricks to hanging Whisper Clips and Hat Channels
* 07.13.11 - HVAC Items Completed: Dead Vent Inline Fan Installed and enclosed, Air Tubes installed for Vent Dampers and Arzel Zones
* 07.18.11 - Theater Insulation Nearly Complete, All Holes Caulkded and Puddy Pads on Light Gang Boxes
* 07.18.11 - Theater Foyer Sheet Rocked
* 07.31.11 - 5/8" OSB and Plywood installed on Ceiling
* 08.04.11 - 5/8" OSB Installed on Walls (First Layer)
* 08.06.11 - 5/8" Drywall and Green Glue Installed on Walls and Ceiling (Second Layer)
* 08.09.11 - Taping and Mudding Drywall Begins
* 08.10.11 - Gray Primer Applied to Drywall
* 08.12.11 - Our Newborn Arrives
* 08.13.11 - Cement Floor Cut up to Recess Electrical and Data Outlets for Back Row Seating
* 08.21.11 - Elk Security Panel Cleaned Up
* 08.22.11 - MainLobby User Interface for the Elk Security System
* 09.09.11 - Photos of Basement
* 09.21.11 - Patch Panel Cabinet Framed In and Bar Area Cabinets Installed
* 09.26.11 - 2x4x12's Added to Soffit and Stairway Platform Construction Begins
* 09.28.11 - First Row Riser Construction Started
* 09.28.11 - Granite Bar Top Installed
* 09.28.11 - DBox Alumninum Frame Assembled
* 10.04.11 - First Layer of 3/4" OSB Installed on First Row Platform
* 10.05.11 - Second Layer of 3/4" OSB Installed on First Row Platform
* 10.06.11 - Profile Illustration of Bar Construction Outside Theater
* 10.11.11 - Riser Step Framing Started
* 10.15.11 - Front Stage Framing Started
* 10.19.11 - Second Layer of 3/4" OSB Added to Front Stage and Steps
* 10.20.11 - Composite Image of Actual Photo at Stage of Construction with 3D Wireframe Render
* 10.22.11 - Filled Stage with Sand
* 10.24.11 - Composite Image of Actual Photo at Stage of Construction with 3D Render
* 10.24.11 - Insulated Areas of Front Stage and Side Steps
* 10.25.11 - Cutting OC703 and Corner Bass Traps Installed
* 10.26.11 - Projected Video onto Wall for estimating Appropriate Screen
* 10.26.11 - Nailed Two Layers of Recycled Denim to Screen Wall
* 10.27.11 - 3D Renders of Red Vs Black Soffit Underside
* 11.02.11 - Cut 16 Holes for 4" LED Can Lights
* 11.04.11 - First Coat of Benjamin Moore Starry Night Blue rolled onto Star Ceiling Area
* 11.11.11 - Can Light Housing Installed in Open Soffit
* 11.12.11 - Patch Panel Terminated
* 11.13.11 - Started 3/4" MDF Speaker Column
* 11.18.11 - Column Construnction Plans with Measurements
* 11.18.11 - Moulding Installed on Bar Cabinets
* 11.18.11 - Bar Plan with Measurements
* 11.18.11 - Rec Room Photos
* 11.21.11 - More Column Construction and Moulding
* 11.22.11 - Detailed Diagram of Mouldings and their Profiles used in the Theater
* 11.23.11 - Building a Removable Magnet Speaker Frame with Black GOM Fabric
* 12.12.11 - Spray Painting 4" LED Can Lights Black
* 12.14.11 - Installed 4" LED Can Lights
* 12.17.11 - Completed Removable Speaker Grill Frames
* 12.18.11 - Attaching Columns to the Wall
* 12.19.11 - Installing Gang Boxes for Data and Electric into Columns
* 12.26.11 - Started working on Oak Steps and Bull Nose
* 12.27.11 - Quick Tips on Cutting Curves with the Jig Saw
* 12.27.11 - Carpet VS Hard Wood on Stage Renders and Discussion
* 12.31.11 - Creating the Large Curved Bull Nose in front of the Front Row
* 01.03.12 - Started Cutting the Oak for the top of the Front Stage
* 01.08.12 - Adding 1/2" Base Shoe under Oak Steps and Bull Nose to create Rounded Underside Edge, Assembling the Front Stage Step
* 01.13.12 - Assembling the Top Front Oak Stage
* 01.16.12 - Using a Biscuit Joiner to Assemble the Front Oak Stage
* 01.21.12 - Started Attaching Lower Third 3/4" MDF Panels to Wall using Green Glue and Screws
* 01.22.12 - Finished Mounting all Columns
* 01.26.12 - Photo Comparison of Protostar, Sy Fabrics Black Plush Triple Velvet and Fidelio Velvet
* 01.29.12 - Routered Bull Nose with a 1/2" Round Over Bit on Front and 1/8" Round Over Bit on Back Side
* 02.01.12 - Started Building 45 Degree Front Corner Cabinet Frames
* 02.09.12 - Started Building Front Arched Cabinet Frame
* 02.15.12 - Notching the Divider Facers for the Front Cabinet Frame
* 02.18.12 - Front Center Cabinet Door Construction
* 02.20.12 - Composite Image of Actual Photo at Stage of Construction with 3D Render
* 02.22.12 - Front Corner Cabinet Doors Installed
* 02.23.12 - TIP: Assembling Bowed Boards during Cabinet Door Construction
* 02.27.12 - Added Base Cap Moulding to Cabinet Doors
* 03.04.12 - Magnetic Latches
* 03.11.12 - Creating a Sharped Seam Fabric Soffit
* 03.18.12 - Installed a Recessed Temperature Sensor
* 03.19.12 - Finished Sanding Bare MDF Column Edges down to 220 https://www.avsforum.com/forum/post/1470#post_21797382"
* 03.21.12 - Built Corner Pine Cap
* 03.22.12 - Applied MH Ready Patch to all joints and Screw Holes on Columns 
* 03.25.12 - Finished GG all lower wall MDF, Notched Bullnose for Baseboard, Final Installation of Bullnose Behind Front Row 
* 03.28.12 - Diagram with Dimensions Showing Construction of Bullnose and Stair Tread using Base Shoe 
* 03.31.12 - Diagram with Dimensions Showing Tall Column Construction
* 04.02.12 - Started Installing Crown Moulding around Perimeter of Room
* 04.03.12 - Coped an Inside Corner Crown Moulding
* 04.04.12 - Started Installing Chair Rail
* 04.05.12 - Composite Image of Actual Photo at Stage of Construction with 3D Render
* 04.07.12 - Started Column Trim Moulding, TIPS
* 04.09.12 - Started Installing Base Board
* 04.11.12 - Started Installing Panel Moulding
* 04.17.12 - Started Construction Fabric Panels
* 04.20.12 - Tips on Cutting GOM Fabric [Rotary Cutting Tool, Straigt Edge Clamp]
* 04.23.12 - Building a Fabric Frame around Receptacle Switches and Vents, Started Double Jamb Door Construction
* 04.27.12 - Installing Door Hinges and Door Lock
* 04.30.12 - Hanging Door and Double Jambs
* 05.04.12 - Built Patch Panel Door within a Fabric Frame
* 05.06.12 - Building Fabric Frames Surrounding Door Casing
* 05.07.12 - 3D Concepts of Potential Back Bar
* 05.08.12 - Assembling Moulding Frames for Columns using Framing Jig
* 05.14.12 - Started working on D-Box Platform top Using Two Layers of 3/4" Birch Plywood
* 05.17.12 - Built Recessed Access Panels for D-Box Actuators
* 05.22.12 - Started Installing GOM Fabric Under Soffit Light Tray
* 05.31.12 - Final Light Tray Moulding Diagram, Started Installing Soffit Mouldings
* 06.06.12 - Room Cleanup and then Started Priming the Room
* 06.07.12 - First Coat of Black Benjamin Moore Paint
* 06.17.12 - Installing Shelving Brackets for Speakers, Working on Theater Foyer Moulding, Stapled GOM Fabric to Cabinet Door
* 06.20.12 - Nearly Finished Painting
* 08.13.12 - Construction Completed
* 08.28.12 - LED TV Movie Poster Now Displays Start / End Time of Movie using MainLobby
* Working on Room Acoustics, Picture, Automation User Interface
* 11.05.13 - Dual Sealed DIY 18" Dayton Subwoofer Construction
* 11.05.13 - Dual Sealed DIY 18" Dayton Subwoofer Construction (External Thread)
* 01.13.14 - Aura Pro Bass Shaker install in Berkline Chair
 
See less See more
1 19
#752 ·

Quote:
Originally Posted by mcascio /forum/post/21095497


The sand was delivered this morning for the front stage.



Here's a pic of one of the rolls of EcoShield 1" recycled Denim.

What is the denim for?
 
#758 ·
We were able to get another layer of OSB added to the steps leading to the front row. Roofing felt was put in between the layers again. The front stage step OSB layer was also cut to fit. It actually worked out really nice since the front stage is just under 4' deep. So the remnant used from the top of the stage fit perfectly on the step below. He just traced the curve 11" away from the first cut. We used 1/2" MDF for behind the front row seating. I'll either paint it black or apply some type of fabric treatment to it. Probably just paint it black since it won't be visible.


Here are some pics of tonights activities.



















 
#759 ·

Quote:
Originally Posted by DavidK442 /forum/post/21102894


I've never seen OSB look so good. A bonafide work of art.

Dying to see how closely the real thing resembles those amazing renderings...even though I still vote for the tan.

Thanks David. After a couple beers, my friend Brian's cuts really become more fluid.
Funny you should ask about it matching up with the renderings. Here's a composite image of the rendered room combined with the actual photo.


Looks like we've stuck pretty close the actual plan thus far.





No seats in the render:
 
#760 ·
This is one GORGEOUS looking theater my friend. Very nice. May I ask what the metal setup is in the first row? And what size your room is?


*Sorry I didnt read earlier, I just found this build. I am sure to read back through when i get a minute.


*Subscribed
 
#761 ·

Quote:
Originally Posted by Iusteve /forum/post/21105192


This is one GORGEOUS looking theater my friend. Very nice. May I ask what the metal setup is in the first row? And what size your room is?


*Sorry I didnt read earlier, I just found this build. I am sure to read back through when i get a minute.


*Subscribed

Platform for a DBox setup
 
#765 ·

Quote:
Originally Posted by Iusteve /forum/post/21105192


This is one GORGEOUS looking theater my friend. Very nice. May I ask what the metal setup is in the first row? And what size your room is?


*Sorry I didnt read earlier, I just found this build. I am sure to read back through when i get a minute.


*Subscribed

Thanks Iusteve,


My first post in this thread contains some plans that show all the room dimensions:
http://www.avsforum.com/avs-vb/showthread.php?t=1208912


As Larry mentioned the metal structure is to support the 3 chairs in the front row for the DBox motion platform. This raises, shakes and rocks your world all synced to the movie.
 
#766 ·

Quote:
Originally Posted by JTR7 /forum/post/21106540


The eco friendly house makes sense now! Have to offset the H3! :p


Kidding, of course. I love big cars.


Looks cool. The rendering software still never ceases to amaze. The superimposed final product is sweet.

It's a careful balancing act.
But you can blame my wife since it's her's...although my truck isn't any better.
 
#767 ·

Quote:
Originally Posted by Jreays /forum/post/21107933


Awesome Build! Great project to follow. I hope to start my basement theater soon but yours will be the unobtainable dream for me right now. Subscribed! Keep up the great work!

Thanks for tagging along with me and good luck on your theater. It's a journey. While I didn't take advantage of it, I'd check out some of the pro services offered here on the forum from guys like Dennis. It would have been money well spent and saved me tons of research.



Officially moved about 500 lbs of sand last night. Only about a ton more to go.
 
#768 ·

Quote:
Originally Posted by mcascio /forum/post/21108137


Thanks Iusteve,



As Larry mentioned the metal structure is to support the 3 chairs in the front row for the DBox motion platform. This raises, shakes and rocks your world all synced to the movie.

Oh wow cant wait to see this finished. Maybe a youtube video for us when your done showing it in action?
 
#769 ·
You bet. I could shoot some video. I'll need to test it out prior to adding the top layer of 3/4" osb to it before carpeting so I can fine tune how much perimeter I'll need to allow the platform to move. I'd like the carpet to be as seamless as possible between the platform deck and the riser.
 
#771 ·

Quote:
Originally Posted by HFGuy /forum/post/21109172


Man I am so jealous !!! But one detail i have to know. The distance between the stage and the riser is really small, do you think it was worth the effort ?


Yeah - I ended up deciding to keep that just because it helped with the look of the stage. I wanted two steps on the front stage. If I bumped the stage up another 7" I wouldn't be able to fit a sub in the front middle of the room and still squeeze under the screen.
 
#772 ·
I finished filling up half the stage with sand last night. Looks like I'll be about 7 bags short to complete the other half. The sand from Lowe's was all dry which was nice.


While I know the plastic is there to contain the sand, am I trying to completely seal the top so no water can penetrate in? Or should I just be more worried about creating a bottom shell? I imagine once two layers of 3/4" cover the top, that water would ever find it's way into it.

 
#773 ·
I finished emptying all of the remaining sand bags into the other half of the stage. Looks like I'm about 10 bags shy. So I'll pick those up tonight and finish that phase up.


I need to zero in on the construction of the false screen wall next.


For the some of the side walls, If I'm putting one inch acoustic material on the wall, should I furring out the wall exactly 1" or should I plan for 1.25" to make sure the material doesn't push against the GOM fabric?


Another composite image I created blending reality with vision:
 
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top