The Cinemar Home Theater Construction Thread

972K views 3K replies 316 participants last post by  mcascio 
#1 · (Edited)

Electronic House 2013 Gold Award Winner
Best Home Theater $25,000 - $75,000
 
 

AVS Home Theater of the Month
 
 
SEATING
* FRONT ROW: 3 Curved Berkline 45003 Black Leather Motorized Recliners
* BACK ROW: 4 Curved Berkline 45003 Black Leather Motorized Recliners

SPEAKERS
* CENTER: M&K S-5000 THX
* FRONT LEFT/RIGHT: M&K S-5000 THX
* ATMOS TOP FRONT LEFT/RIGHT: M&K SS-150 THX
* ATMOS TOP REAR LEFT/RIGHT: M&K SS-150 THX
* SURROUND LEFT/RIGHT: M&K SS-150 THX
* BACK LEFT/RIGHT: M&K SS-150 THX
* SUB1: M&K MX-350 THX
* SUB2: HSU VTF-15H
* SUB 3 & 4: DIY Flat Pack Builds - Dayton Audio RSS460HO-4 18" Reference HO Subwoofer  4 Cubic Feet each

ROOM DIMENSIONS & MEASUREMENTS
* BEFORE WALLS: 27' Deep x 17'9" Wide (excludes theater foyer entryway)
* FINISHED ROOM AFTER SOUND PROOFING: 25'8" Deep x 16'9.5" Wide
* NOTES: The theater is being constructed in part of our unfinished basement. There is a 23" drop in the basement to allow for stadium seating.
* SHORTEST CEILING HEIGHT BEFORE CONSTRUCTION: 8'10"
* TALLEST CEILING HEIGHT BEFORE CONSTRUCTION in Drop Down area: 10'9"
* Front Row: 8'6" from Front of Seat to screen
* Back Row: 14'7" from Front of Seat to screen
* Projector: 16'2" from Lens to Screen
* Screen: 136" Wide 2.35
VIEWING DISTANCE TO BOTTOM OF SCREEN FROM CENTER FRONT ROW
* SEAT INCLINED: 10' 5 1/2"
* SEAT DECLINED: 11' 2"
 

EQUIPMENT
* RECEIVER: Denon X5200W, OLD: Denon AVR-4520CI (11.2), OLD: Onkyo NX-TR3008 (FOR SALE)
* AMP: Emotiva XPA-5 (Center, Front Left & Right, Side Surround Left & Right)
* AMP: Behringer EP4000 (2 Dayton Subs)
* AMP: (2) Dayton APA100 (Atmos Speakers Top Front & Top Rear inside Soffit)
* BLU-RAY PLAYER: Dune HD Max
* GAMING: PS3, (2) XBOX-360
* POWER CONDITIONER: Belkin PF60
* IMAGE PROCESSING: Darbee Darblet DVP5000
* STORAGE: Cinemar MLD-4000 12 TB Mass Storage Server
* PROJECTOR: Panasonic PT-AE8000U
* SCREEN: 136" Wide 2.35 AT Screen (Seymour AV)
* TABLET/iPAD/PHONE USER INTERFACE: Cinemar's MainLobby / MLServer / DVDLobby
* REMOTE CONTROL: Logitech Harmony 700
* LIGHTING CONTROL: Insteon via MainLobby
* THERMOSTAT CONTROL: Proliphix NT-20E Thermostat via MainLobby
* INTERCOM: Not sure yet - most likely go with Russound
 
CARPETING
* Masland Quadrate Times Square
 
FABRIC
* Red Walls - FR701 GOM Style 2100 (#418) Claret Accent Fabric
* Speaker Frames - FR701 GOM Style 2100 (#408) Black Fabric
* Top of Front Cabinet Below Screen & Sides of Vertical Front Cabinets Facing Screen - Protostar Self-Adhesive Flocked Light Trap Material
* Bordering Edges that the Seymour AV Screen sit's on - Black Triple Plush Velvet

SOUND PROOFING
The room above the theater is a nursery and office. One of the rooms next to the theater is a furnace room. So it's important to keep the sound out of the rooms above and prevent sound coming in from the furnace room.
Current plan of attack is to use two layers of 5/8" drywall and Green Glue with sound absorption clips. Staggered stud walls will be on any framed walls.
* Minimum 1-3/4" Solid Core Door with automatic door bottom.

PAINTED STAR CEILING
* Hand painted black light star ceiling painted by Night Sky Murals
 
VIRTUAL MOVIE POSTER
* A 40" LED TV mounted in Portrait displays the Cover Art of the currently movies along with statistics like: Number of Movies watched in theater, Minutes remaining of playing movies, movies coming soon, lbs of popcorn consumed, etc.  The user interface on the LED Movie Poster is powered by MainLobby.
 
BASS SHAKERS
Aura Pro Bass Shakers in Back Row (4 Chairs)

SOUND TREATMENT
Recycled Denim/ Titus EcoShield (1" x 4' x 50') (Bought from Vyron Corporation)

D-BOX MOTION PLATFORM
D-Box Motion Platform in Front Row (3 Chairs)


VIRTUAL (MATTERPORT) WALK-THROUGH OF CINEMAR HOME THEATER
https://my.matterport.com/show/?m=ur3p2q8Hk9r



UNFINISHED BASEMENT AREA


FINAL ATMOS SPEAKER PLACEMENT






MY ORIGINAL PROPOSED THEATER DESIGN (Top View)


MY ORIGINAL PROPOSED THEATER DESIGN (Side View)


LATEST THEATER DESIGN (Top View)


LATEST THEATER DESIGN (Side View - RESERVED)

LATEST THEATER DESIGN (3D View)







 
 
FABRICS, CARPET & PAINT INFORMATION

 
 
 
COMPOSITED 3D IMAGE WITH ACTUAL PHOTO [There is an angled divider.  The Left Upper Area is the actual photo, the right lower area is 3D]

 
FINAL ACTUAL PHOTO WITH NIGHT SKY MURAL STAR CEILING:

 
LED TV MOVIE POSTER DISPLAYS CURRENTLY PLAYING MOVIE AND ACTUAL START / END TIMES USING CINEMAR'S MAINLOBBY SOFTWARE

 
iPad Movie Selection using Cinemar Software. Also controls thermostat, lighting, projector, receiver and security.

 
THREAD INDEX
* 12.22.09 - Construction Thread Started
* 04.27.10 - Generac House Generator Installed
* 12.04.10 - Cleaned up 4 Miles of Cable in Media Rack
* 03.19.11 - Construction Lumber and Green Glue arrived, Reworked Sump Pump Area and Added Additional Breakers to Media Rack Closet
* 03.25.11 - 3D Renders of Rec Room Area outside Theater
* 03.27.11 - Framing of Interior Basement Walls Started
* 04.03.11 - Theater Framing Started, Foundation Injection Crack Repair Completed
* 04.16.11 - Illustration Showing Theater Construction using Whisper Clips, DC-04 Clips, Drywall and OSB
* 04.16.11 - Illustration Showing Theater Heating/Cooling Supply Sound Proofing
* 04.21.11 - 3D Wireframe Composite of Seats and Columns within Theater Shell
* 05.29.11 - Dead Vent Framed and Plumbing for Bar Sink Moved out of Theater
* 06.01.11 - Started Framing Soffits
* 06.04.11 - 3D Illustration of Clips and Channel Construction
* 06.06.11 - Started Framing Interior Theater Walls
* 06.08.11 - Raising the Sunken Concrete Floor Up
* 06.12.11 - Theater Room Wiring Diagram
* 06.12.11 - Suspended Sound Proofed Vent Muffler Diagram
* 06.15.11 - Started Construction of Vent Mufflers
* 06.19.11 - Ran Wiring for Speakers, Bass Shakers, Cat5 and Subs. Puddy Pads
* 06.23.11 - Can Light Backer Box Construction
* 06.23.11 - Initial Lighting Diagram
* 06.25.11 - Vent Muffler Installed using IB-3 Clips
* 06.26.11 - Corner Clamps, Acoustic Sealant, Network Thermostat Wired, R19 in Ceiling Started
* 06.29.11 - Speaker and Column Placement Diagram and Discussions
* 06.29.11 - Pipe Wrap on Vent Boots, IB-3 Clips on 2nd Vent Muffler, Instulating Vent Muffler
* 07.01.11 - 2nd Vent Muffler Installed into Soffit
* 07.01.11 - TIP: Whisper Clip Inside Corner Placement Diagram
* 07.03.11 - Hung Whisper Clips and Started Installed Hat Channel
* 07.05.11 - Sound Proofed Cold Air Return 1 and all Hat Channels Installed
* 07.07.11 - Sound Proofed Cold Air Return 2 - From the Inside of the Cold Air Return
* 07.11.11 - Tips and Tricks to hanging Whisper Clips and Hat Channels
* 07.13.11 - HVAC Items Completed: Dead Vent Inline Fan Installed and enclosed, Air Tubes installed for Vent Dampers and Arzel Zones
* 07.18.11 - Theater Insulation Nearly Complete, All Holes Caulkded and Puddy Pads on Light Gang Boxes
* 07.18.11 - Theater Foyer Sheet Rocked
* 07.31.11 - 5/8" OSB and Plywood installed on Ceiling
* 08.04.11 - 5/8" OSB Installed on Walls (First Layer)
* 08.06.11 - 5/8" Drywall and Green Glue Installed on Walls and Ceiling (Second Layer)
* 08.09.11 - Taping and Mudding Drywall Begins
* 08.10.11 - Gray Primer Applied to Drywall
* 08.12.11 - Our Newborn Arrives
* 08.13.11 - Cement Floor Cut up to Recess Electrical and Data Outlets for Back Row Seating
* 08.21.11 - Elk Security Panel Cleaned Up
* 08.22.11 - MainLobby User Interface for the Elk Security System
* 09.09.11 - Photos of Basement
* 09.21.11 - Patch Panel Cabinet Framed In and Bar Area Cabinets Installed
* 09.26.11 - 2x4x12's Added to Soffit and Stairway Platform Construction Begins
* 09.28.11 - First Row Riser Construction Started
* 09.28.11 - Granite Bar Top Installed
* 09.28.11 - DBox Alumninum Frame Assembled
* 10.04.11 - First Layer of 3/4" OSB Installed on First Row Platform
* 10.05.11 - Second Layer of 3/4" OSB Installed on First Row Platform
* 10.06.11 - Profile Illustration of Bar Construction Outside Theater
* 10.11.11 - Riser Step Framing Started
* 10.15.11 - Front Stage Framing Started
* 10.19.11 - Second Layer of 3/4" OSB Added to Front Stage and Steps
* 10.20.11 - Composite Image of Actual Photo at Stage of Construction with 3D Wireframe Render
* 10.22.11 - Filled Stage with Sand
* 10.24.11 - Composite Image of Actual Photo at Stage of Construction with 3D Render
* 10.24.11 - Insulated Areas of Front Stage and Side Steps
* 10.25.11 - Cutting OC703 and Corner Bass Traps Installed
* 10.26.11 - Projected Video onto Wall for estimating Appropriate Screen
* 10.26.11 - Nailed Two Layers of Recycled Denim to Screen Wall
* 10.27.11 - 3D Renders of Red Vs Black Soffit Underside
* 11.02.11 - Cut 16 Holes for 4" LED Can Lights
* 11.04.11 - First Coat of Benjamin Moore Starry Night Blue rolled onto Star Ceiling Area
* 11.11.11 - Can Light Housing Installed in Open Soffit
* 11.12.11 - Patch Panel Terminated
* 11.13.11 - Started 3/4" MDF Speaker Column
* 11.18.11 - Column Construnction Plans with Measurements
* 11.18.11 - Moulding Installed on Bar Cabinets
* 11.18.11 - Bar Plan with Measurements
* 11.18.11 - Rec Room Photos
* 11.21.11 - More Column Construction and Moulding
* 11.22.11 - Detailed Diagram of Mouldings and their Profiles used in the Theater
* 11.23.11 - Building a Removable Magnet Speaker Frame with Black GOM Fabric
* 12.12.11 - Spray Painting 4" LED Can Lights Black
* 12.14.11 - Installed 4" LED Can Lights
* 12.17.11 - Completed Removable Speaker Grill Frames
* 12.18.11 - Attaching Columns to the Wall
* 12.19.11 - Installing Gang Boxes for Data and Electric into Columns
* 12.26.11 - Started working on Oak Steps and Bull Nose
* 12.27.11 - Quick Tips on Cutting Curves with the Jig Saw
* 12.27.11 - Carpet VS Hard Wood on Stage Renders and Discussion
* 12.31.11 - Creating the Large Curved Bull Nose in front of the Front Row
* 01.03.12 - Started Cutting the Oak for the top of the Front Stage
* 01.08.12 - Adding 1/2" Base Shoe under Oak Steps and Bull Nose to create Rounded Underside Edge, Assembling the Front Stage Step
* 01.13.12 - Assembling the Top Front Oak Stage
* 01.16.12 - Using a Biscuit Joiner to Assemble the Front Oak Stage
* 01.21.12 - Started Attaching Lower Third 3/4" MDF Panels to Wall using Green Glue and Screws
* 01.22.12 - Finished Mounting all Columns
* 01.26.12 - Photo Comparison of Protostar, Sy Fabrics Black Plush Triple Velvet and Fidelio Velvet
* 01.29.12 - Routered Bull Nose with a 1/2" Round Over Bit on Front and 1/8" Round Over Bit on Back Side
* 02.01.12 - Started Building 45 Degree Front Corner Cabinet Frames
* 02.09.12 - Started Building Front Arched Cabinet Frame
* 02.15.12 - Notching the Divider Facers for the Front Cabinet Frame
* 02.18.12 - Front Center Cabinet Door Construction
* 02.20.12 - Composite Image of Actual Photo at Stage of Construction with 3D Render
* 02.22.12 - Front Corner Cabinet Doors Installed
* 02.23.12 - TIP: Assembling Bowed Boards during Cabinet Door Construction
* 02.27.12 - Added Base Cap Moulding to Cabinet Doors
* 03.04.12 - Magnetic Latches
* 03.11.12 - Creating a Sharped Seam Fabric Soffit
* 03.18.12 - Installed a Recessed Temperature Sensor
* 03.19.12 - Finished Sanding Bare MDF Column Edges down to 220 https://www.avsforum.com/forum/post/1470#post_21797382"
* 03.21.12 - Built Corner Pine Cap
* 03.22.12 - Applied MH Ready Patch to all joints and Screw Holes on Columns 
* 03.25.12 - Finished GG all lower wall MDF, Notched Bullnose for Baseboard, Final Installation of Bullnose Behind Front Row 
* 03.28.12 - Diagram with Dimensions Showing Construction of Bullnose and Stair Tread using Base Shoe 
* 03.31.12 - Diagram with Dimensions Showing Tall Column Construction
* 04.02.12 - Started Installing Crown Moulding around Perimeter of Room
* 04.03.12 - Coped an Inside Corner Crown Moulding
* 04.04.12 - Started Installing Chair Rail
* 04.05.12 - Composite Image of Actual Photo at Stage of Construction with 3D Render
* 04.07.12 - Started Column Trim Moulding, TIPS
* 04.09.12 - Started Installing Base Board
* 04.11.12 - Started Installing Panel Moulding
* 04.17.12 - Started Construction Fabric Panels
* 04.20.12 - Tips on Cutting GOM Fabric [Rotary Cutting Tool, Straigt Edge Clamp]
* 04.23.12 - Building a Fabric Frame around Receptacle Switches and Vents, Started Double Jamb Door Construction
* 04.27.12 - Installing Door Hinges and Door Lock
* 04.30.12 - Hanging Door and Double Jambs
* 05.04.12 - Built Patch Panel Door within a Fabric Frame
* 05.06.12 - Building Fabric Frames Surrounding Door Casing
* 05.07.12 - 3D Concepts of Potential Back Bar
* 05.08.12 - Assembling Moulding Frames for Columns using Framing Jig
* 05.14.12 - Started working on D-Box Platform top Using Two Layers of 3/4" Birch Plywood
* 05.17.12 - Built Recessed Access Panels for D-Box Actuators
* 05.22.12 - Started Installing GOM Fabric Under Soffit Light Tray
* 05.31.12 - Final Light Tray Moulding Diagram, Started Installing Soffit Mouldings
* 06.06.12 - Room Cleanup and then Started Priming the Room
* 06.07.12 - First Coat of Black Benjamin Moore Paint
* 06.17.12 - Installing Shelving Brackets for Speakers, Working on Theater Foyer Moulding, Stapled GOM Fabric to Cabinet Door
* 06.20.12 - Nearly Finished Painting
* 08.13.12 - Construction Completed
* 08.28.12 - LED TV Movie Poster Now Displays Start / End Time of Movie using MainLobby
* Working on Room Acoustics, Picture, Automation User Interface
* 11.05.13 - Dual Sealed DIY 18" Dayton Subwoofer Construction
* 11.05.13 - Dual Sealed DIY 18" Dayton Subwoofer Construction (External Thread)
* 01.13.14 - Aura Pro Bass Shaker install in Berkline Chair
 
See less See more
1 19
#1,577 ·

Quote:
Originally Posted by mcascio /forum/post/21877942


No. The photos are straight from the camera/lens without any manipulation.

I guess that s'plaines the cost of the lens. Really nice!
 
#1,578 ·
I worked till about 2am last night in the theater. I finished installing all of the lower side column mouldings.


I only had three different moulding sizes to cut. So I used some scrap wood clamped to the fence to act as a stop which makes getting accurate cuts a breeze.


Here's the larger cut.



To cut the smaller pieces, I just used another block cut to size that I could easily add remove to the fence allowing me to switch freely between the two sizes without reclamping.




Next, I remarked my column sides where the moulding will be installed. I was fortunate enough to use 2" from the front of the column which made it pretty easy to just flush my 2" square against the face and trace my line.




I made everything square off the face of the column and didn't worry about breaking out a level.


I built this jig so I could clamp it to the face and have a nice hard edge to set my first long piece of moulding.



A little glue before installing.



Then I set it against my block and nailed down.



Then I glued up the two smaller pieces. Followed by the final larger right moulding.



Then nailed while holding the pieces. Make sure you shoot straight otherwise the moulding could shift. I learned to start installing everything in place that are not as visible in the room. So by time I made it to the more visible parts I worked out any kinks.


This putty knife worked nice to remove any excess glue.




Finally, the completed project.






 
#1,581 ·

Quote:
Originally Posted by jdanforth /forum/post/21879233


Yo! Those columns are handsome! Nice job!


Oh and that stop block trick is essential. The day I learned that it changed my woodworking forever!

Thanks.


Yeah. Just wish I had more in my arsenal. It would probably make me more efficient.
 
#1,582 ·

Quote:
Originally Posted by nickbuol /forum/post/21880042


You suck so bad at being bad at this...
Yea, read it again.


I am always AMAZED at your woodworking skills and the design and execution of your theater build.

That's too funny. But isn't that a double negative?
 
#1,585 ·

Quote:
Originally Posted by mcascio /forum/post/21880080


So I'm going to attempt installing the base boards now. I'm planning to go with a 1/2" pad and 1/4" thick carpet (Quadrate).


Given the carpet is pretty thin...I'm assuming I should raise the baseboard about 3/8" off the ground. Does that sound right?

I've never done baseboard with carpet before but it sounds a little tight? Don't forget you're going to probably put shoe moulding over the baseboard once the carpet is in to cover any gaps. In addition I don't know how level your floor is, you may have some slight peaks and valleys.
 
#1,586 ·

Quote:
Originally Posted by Larry M /forum/post/0



I've never done baseboard with carpet before but it sounds a little tight? Don't forget you're going to probably put shoe moulding over the baseboard once the carpet is in to cover any gaps. In addition I don't know how level your floor is, you may have some slight peaks and valleys.

Hi Larry. I already started setting it a hair above 3/8". I think the carpet will ramp down from the 1/2" pad over the tack strip and then hopefully squeeze under the base. I'm pretty sure you only use base shoe on hard surfaces like tile or hardwood. I know the carpet guy initially said he will need to ramp up to the 3/4" bullnose because it will drop down on the tack strip.


Absolute worst case, I could go with a 3/8" pad...although not ideal for sound.
 
#1,587 ·

Quote:
Originally Posted by mcascio /forum/post/21882043


Hi Larry. I already started setting it a hair above 3/8". I think the carpet will ramp down from the 1/2" pad over the tack strip and then hopefully squeeze under the base. I'm pretty sure you only use base shoe on hard surfaces like tile or hardwood. I know the carpet guy initially said he will need to ramp up to the 3/4" bullnose because it will drop down on the tack strip.


Absolute worst case, I could go with a 3/8" pad...although not ideal for sound.


Haven't had carpet in years. Looking forward to how yours turns out so I know what to do
 
#1,589 ·
i must say this the highlight of my mondays when i return to work is to check out your progress...just stunning, my build is starting this weekend and your build definality gets the creative juices flowing.
 
#1,590 ·
Looking great Mario! Congrats on getting some serious work done in the room.
 
#1,593 ·
Plan is still to have the ceiling painted by that guy on the forum?


I sent him an e-mail several months ago and never received a response. Last I checked he hasn't checked in on his thread in a while
 
#1,594 ·

Quote:
Originally Posted by snickers1 /forum/post/21885197


i must say this the highlight of my mondays when i return to work is to check out your progress...just stunning, my build is starting this weekend and your build definality gets the creative juices flowing.

Thanks snickers1. Good luck with your build / journey. It's a long road.
 
#1,596 ·

Quote:
Originally Posted by rs691919 /forum/post/21888354


Maybe you've already answered this, but what color are you planning to paint the chair rail and baseboard moulding (or are you leaving them white?)?

They will both be painted black. The chair rail came primed already and the baseboard was primed and painted and left over from the basement project.
 
#1,597 ·

Quote:
Originally Posted by Larry M /forum/post/21889036


Plan is still to have the ceiling painted by that guy on the forum?


I sent him an e-mail several months ago and never received a response. Last I checked he hasn't checked in on his thread in a while

Hi Larry. I did just recently correspond with him. I'd like to try and get the ceiling done prior to the carpet install if possible.


I would email him again. I know he does travel alot and has a hard time keeping up with all the inquiries.
 
#1,599 ·
I made another big push last night after dinner until about 2am.


I finished putting up all the base for now at least until the door is installed.


I also started on the mouldings in between the columns.


First I cut to size all the vertical pieces since they were all the same size. Trimmed here and there to ensure they were identical in size.


I used my base (4 1/4" tall) as my spacer all around. I started by tracing my shape inbetween the columns on the MDF. Since I made sure to mount the chair rail level to the ground I went off of that as my guide since it would be consistent as opposed to using the base board which fluctuates in height with the ground.


I dabbed a bit of glue on the backside of the moulding, especially in the corners, and pushed the top piece snug against my base board spacer to ensure it was straight and level. Then brad nailed.




Next, I glued the back side and joints of the two side pieces and set in place.




Then finally glued the bottom piece and placed on the wall. By time you finish positioning all the corners so they are square...the glue should start doing it's magic.




Finally...I brad nailed the remaining sides and bottom to the wall. Make sure to go straight so the moulding doesn't slide.







 
#1,600 ·
Looks great, Mario.
 
#1,601 ·
I'm looking for a little feedback on the moulding between the chair rail, base and columns in these two renders.


I need to decide whether to have the moulding follow the stairs with an "L" shape or just run it straight. This would be the only place this occurs in the room if I decide to make an "L" shape.


Any thoughts?