a/ac/acf5008c_BasementFinishing-001.jpeg

Construction: Upper left: framed Lower left: wired and dry wall up Upper right: Sanded, Painted, Sub-floor installed Lower right: Laminate flooring and 3D Panels installed

0

Comments

Photo Sharing Gallery by PhotoPost
Copyright © 2012 All Enthusiast, Inc.