Update 03/19/09 in order to add index
INDEX:
A river runs through it
Foundation Cracks Repaired
Temporary Set up for Son's B-day which shows off proj. bay and attic t-stat
Bedsheet Screen
First piece of sheetrock is raised
Pocket door rails and temp switch bank
3rd Heating Zone added to Hydronic boiler and HVAC blower unit
HT primed and the beginnings of my Star Panel
Insulating my pocket door
Mini soffits go up
Riser and Stage
Recreation Room gets sheetrocked and 1st view of equip. closet
Access vent to equipment closet wiring and storage area underneath stairs
Plaster patch job to added wall areas and equipment closet
Speaker shelves and stage and riser detail with step lights
Ceiling painted Blue Coal color
Equipment list
Seats get ordered
Recreation room gets Primed and Dricored
Yoda
Initial & revised sketch of floorplan including HT layout and lighting
Marquee sign
Curved stage step
Curved soffit frame
Sheetrock & lights on curved soffit & curved false wall
Second tier added to riser, false wall area painted black, HT getting carpeted, front row of seats set up
All HT seats setup
Start of curved screen frame
Finish and set up of curved screen frame
Assembling DIY Anamorphic lens
Screen pics
Completed and painted Anamorphic lens
Start of Drop Ceiling
Dreams and Wishes
New equipment shelving/rack
Star panel installed
Drop ceiling completed & rec. room speakers installed
Light trims and projector bay cover installed
Basement support columns covered up & added a light fixture to the equip. closet
Projector warm up image discussion
CabCool 1202 install and mini review
Current To Do List
Stringers and fabric added underneath mini soffits
Start of the crown trim on mini soffits
Learned something new, crown stops
Final warm up/no signal proj. image currently in use
Finished crown trim on mini soffits with coped inside corners and some fuzzy rope light pics
Finished crown for the starpanel skylight
Flexible fabric panels for screen wall
____________________________________________________________ ________________________
Ok here we go,
I've decided to finally start a build thread after reading in the loganator's thread that it was a commandment to set up a build thread (broke that rule too, till now.. Oops).
Can someone pm me the commandment's I never got my full copy
.
To save time (read as to lazy to type it all over again) I am copying what I stated over at the "motivation" thread about my build, if you already read carry on below the blue:
"The details, I started my build in Jan. 07 thus far I have completed the following:
Framing, I am not using staggered stud or rsic clips etc....just standard framing. When I purchased my home the framing for 3 of the exterior walls in the basement had already been framed and insulated. So I had to frame up the theater wall, mechanical room wall the last remaining exterior wall which is side facing the garage. I also framed a half wall and door underneath the steps coming down for equipment and a seperate closet for electrical panel and water meter. During this process we had some heavy rains in Spring, this led to the discovery of cracks in the foundation wall in two sepeate areas. My builder being none reponsive had to be taken to small claims for recoup of the repair costs.
Electrical, ran all the wiring, receptacles, lighting fixtures. My room width is eleven and half feet so I'm not doing sconces. I have 8 recessed 4"cans.
HVAC a friend helped me complete this, last summer-fall. Seperate Cooling unit, additional heating zone on boiler for forced hot air.
Sheetrock in theater room done. Single layer 1/2" densarmor. No double drywall, green glue or the like. Pleasantly when I had the Supebowl party in a still under construction setup with about 20 people in the room and sound blasting, another guest came and said if she didn't know I was completing the basement she would have never known we were down cause is was so quiet.
Riser done, then re-did to raise an additional 3.5 inches. Stage done loaded with sand. Both stage and riser decoupled. Dricore in HT room done. Walls primed ceiling painted. I wanted to prime the walls incase I didn't do fabric panels and simply to seal the walls. Primed with grey tinted Kilz2 actually looks pretty good as a color. I have since obtained Dazian cloth (thanks Dave) and have to fomulate some wall panels.
I'm doing 4x6 star panel inside of the 8 recessed can area. Panel is done, ceiling frame is done. Need to install and surround with crown and trim.
The rest of the basement is an open area in the process of being sheetrocked.
Need to finish:
Sheetrock-Mud & Tape
Prime and paint this same area
Dricore the rest of the basement
Install doors on mechanical room, equipment closet, electrical closet
Finish pocket door (yes I said pocket door, look at what I would name build thread for reference!!) and surround for home theater room which is located at the front of the theater room. I am doing everything I can to help insulate the hollow cavity.
Install cabinets for kichenette area and perhaps a concession/bar counter.
Install engineered laminate flooring outside of HT and carpeting inside of theather and stairs coming down.
Install drop celing in rec room and gym area(theater room has sheetrock) along with recessed lighting trim and in ceiling speakers.
Setup pool table, and wall mountd LCD.
Finish projector shelf/soffit enclosure and setting up equipment
False wall, cloth frames, screen frame "
End of quoting thyself..
I'm gonna post some pics of some of my initial troubles and progress. Soon to follow pics of where im at now.
This Loganator stuff really works
INDEX:
A river runs through it
Foundation Cracks Repaired
Temporary Set up for Son's B-day which shows off proj. bay and attic t-stat
Bedsheet Screen
First piece of sheetrock is raised
Pocket door rails and temp switch bank
3rd Heating Zone added to Hydronic boiler and HVAC blower unit
HT primed and the beginnings of my Star Panel
Insulating my pocket door
Mini soffits go up
Riser and Stage
Recreation Room gets sheetrocked and 1st view of equip. closet
Access vent to equipment closet wiring and storage area underneath stairs
Plaster patch job to added wall areas and equipment closet
Speaker shelves and stage and riser detail with step lights
Ceiling painted Blue Coal color
Equipment list
Seats get ordered
Recreation room gets Primed and Dricored
Yoda
Initial & revised sketch of floorplan including HT layout and lighting
Marquee sign
Curved stage step
Curved soffit frame
Sheetrock & lights on curved soffit & curved false wall
Second tier added to riser, false wall area painted black, HT getting carpeted, front row of seats set up
All HT seats setup
Start of curved screen frame
Finish and set up of curved screen frame
Assembling DIY Anamorphic lens
Screen pics
Completed and painted Anamorphic lens
Start of Drop Ceiling
Dreams and Wishes
New equipment shelving/rack
Star panel installed
Drop ceiling completed & rec. room speakers installed
Light trims and projector bay cover installed
Basement support columns covered up & added a light fixture to the equip. closet
Projector warm up image discussion
CabCool 1202 install and mini review
Current To Do List
Stringers and fabric added underneath mini soffits
Start of the crown trim on mini soffits
Learned something new, crown stops
Final warm up/no signal proj. image currently in use
Finished crown trim on mini soffits with coped inside corners and some fuzzy rope light pics
Finished crown for the starpanel skylight
Flexible fabric panels for screen wall
____________________________________________________________ ________________________
Ok here we go,
I've decided to finally start a build thread after reading in the loganator's thread that it was a commandment to set up a build thread (broke that rule too, till now.. Oops).
Can someone pm me the commandment's I never got my full copy
.To save time (read as to lazy to type it all over again) I am copying what I stated over at the "motivation" thread about my build, if you already read carry on below the blue:
"The details, I started my build in Jan. 07 thus far I have completed the following:
Framing, I am not using staggered stud or rsic clips etc....just standard framing. When I purchased my home the framing for 3 of the exterior walls in the basement had already been framed and insulated. So I had to frame up the theater wall, mechanical room wall the last remaining exterior wall which is side facing the garage. I also framed a half wall and door underneath the steps coming down for equipment and a seperate closet for electrical panel and water meter. During this process we had some heavy rains in Spring, this led to the discovery of cracks in the foundation wall in two sepeate areas. My builder being none reponsive had to be taken to small claims for recoup of the repair costs.
Electrical, ran all the wiring, receptacles, lighting fixtures. My room width is eleven and half feet so I'm not doing sconces. I have 8 recessed 4"cans.
HVAC a friend helped me complete this, last summer-fall. Seperate Cooling unit, additional heating zone on boiler for forced hot air.
Sheetrock in theater room done. Single layer 1/2" densarmor. No double drywall, green glue or the like. Pleasantly when I had the Supebowl party in a still under construction setup with about 20 people in the room and sound blasting, another guest came and said if she didn't know I was completing the basement she would have never known we were down cause is was so quiet.
Riser done, then re-did to raise an additional 3.5 inches. Stage done loaded with sand. Both stage and riser decoupled. Dricore in HT room done. Walls primed ceiling painted. I wanted to prime the walls incase I didn't do fabric panels and simply to seal the walls. Primed with grey tinted Kilz2 actually looks pretty good as a color. I have since obtained Dazian cloth (thanks Dave) and have to fomulate some wall panels.
I'm doing 4x6 star panel inside of the 8 recessed can area. Panel is done, ceiling frame is done. Need to install and surround with crown and trim.
The rest of the basement is an open area in the process of being sheetrocked.
Need to finish:
Sheetrock-Mud & Tape
Prime and paint this same area
Dricore the rest of the basement
Install doors on mechanical room, equipment closet, electrical closet
Finish pocket door (yes I said pocket door, look at what I would name build thread for reference!!) and surround for home theater room which is located at the front of the theater room. I am doing everything I can to help insulate the hollow cavity.
Install cabinets for kichenette area and perhaps a concession/bar counter.
Install engineered laminate flooring outside of HT and carpeting inside of theather and stairs coming down.
Install drop celing in rec room and gym area(theater room has sheetrock) along with recessed lighting trim and in ceiling speakers.
Setup pool table, and wall mountd LCD.
Finish projector shelf/soffit enclosure and setting up equipment
False wall, cloth frames, screen frame "
End of quoting thyself..
I'm gonna post some pics of some of my initial troubles and progress. Soon to follow pics of where im at now.
This Loganator stuff really works





















H20 thanks for the catch.































































)