I spent since my last post until mid-August getting the rough-in electrical done and most of the AV cabling. For a guy who spends most of his time in an office, that stuff is really rough on the hands!
I call this the puzzle wall because I cut out many pieces needed so that the electrical and speaker wire could be run. Then I had to fiqure out where the pieces went to put them back and had to custom create some replacements.

After the wiring came insulation. You can see some of the first drywall on the ceiling.

We all know what drywall looks like so I won't post but, this one photo. Got started by doing the ceiling in the theater first. Without my son and a drywall lift it would have been impossible! I am putting up two layers, with the first having the joints caulked.
