Electricians ran all the whips for outlets and lighting. Only two gang boxes for light switches are in the perimeter walls. All other outlets will be in columns or false walls. Looks like I'll be using a total of 6 breakers and sharing one more that's on the generator for emergency lighting. I routed all my in room cable runs through the studs and just need to acoustic caulk the holes and then finish insulation. Then pick up 5/8" plywood and sob for the first layer.
I'll need to figure out how much material to order so that doesn't hold the project up. After showing my wife the renderings, she made the final decision and it looks like well be going with the claret red.