This weekend I ran a couple hundred feet of PEX piping for hot and cold water...way easier than running copper. Tied it all into the main system and when I turned it back on...no leaks!
I bought my wife a decent little dslr camera for christmas, I have no idea how to use it, but maybe by the time I need good photos I will be better. The following pictures are using the new camera, but I just used it like a point and shoot.
Here is the water line to an outdoor hose bib. It was originally a copper line run below the joists right down the center of the theater room - now it is pex that, when finished, will be inside the soffit.

Here is a view of the main room showing the soffit that has been framed up - probably overbuilt, but its up.

Here is the bathroom. I need to move the stud near the shower lines to make room for the mixing valve (which is why the HW and CW lines are long and capped at the moment). I need to find a suitable shower basin to make sure I know where to place the mixing valve and drain (in case I need to move it). My brother is coming over this next weekend to pour concrete so I need to get this all finalized.

Here is one final view of the main room. If you have been following the progress of the build compared to the original floorplan, you might notice I have deviated from the original plan regarding the bar. The new plan is to put in a countertop with sink along with an undercounter fridge - probably some overhead cabinets for storage.

In the picture above the cabinets/counter will go along the wall just to the right of the miter saw. You can see the water lines and the vent pipe for the sink, if that helps with location.
I bought my wife a decent little dslr camera for christmas, I have no idea how to use it, but maybe by the time I need good photos I will be better. The following pictures are using the new camera, but I just used it like a point and shoot.
Here is the water line to an outdoor hose bib. It was originally a copper line run below the joists right down the center of the theater room - now it is pex that, when finished, will be inside the soffit.
Here is a view of the main room showing the soffit that has been framed up - probably overbuilt, but its up.
Here is the bathroom. I need to move the stud near the shower lines to make room for the mixing valve (which is why the HW and CW lines are long and capped at the moment). I need to find a suitable shower basin to make sure I know where to place the mixing valve and drain (in case I need to move it). My brother is coming over this next weekend to pour concrete so I need to get this all finalized.
Here is one final view of the main room. If you have been following the progress of the build compared to the original floorplan, you might notice I have deviated from the original plan regarding the bar. The new plan is to put in a countertop with sink along with an undercounter fridge - probably some overhead cabinets for storage.
In the picture above the cabinets/counter will go along the wall just to the right of the miter saw. You can see the water lines and the vent pipe for the sink, if that helps with location.

















Did you build those yourself?