Quote:
If there is a delay it should be short term as I read that Sharp and Corning suffered very light damage and will have minimal interruption as geographically Saiki and Keyamama (K1,K2) are not in the northern regions and they build their plants to be self sufficient with their own energy sources and water which is constantly recycled locally as they have been designated Super Green Plants.
Saiki is located near a historic port also and well south of Tokyo and I doubt they send the panels to the north for shipping with a local port is available but it would be understandable that perhaps there could be delays in with some subcontracted parts and infrastructure damage beyond their control. Geographically neither is near the Tsunami regions and the plant is so automated that it shut itself down when the earthquake occurred. Hopefully it's short term.