Hello,
I am curious what guys who are building theaters on the second floor are doing with their sub floor. My second floor "bonus" room is actually ~950ft/sq with 15'x20.5'x9 of it, the theater area. The area is stud only with the "exterior" walls sheeted into the attic area. The walls are obviously sitting on the sub-floor, which is 1 1/8" Advantech. Sound transmits quite easily to the bottom floor at this point. Oh, the cavity is insulation filled, however, i know this does basically nothing. Removing the sub-floor is not an option. Will using Green Glue between another layer of 3/4" sub-floor (or two?) going to do a nice job? I am thinking of Whisper Clips on the walls and ceilings to help isolate the existing walls from the hard attachment to the existing floor.
Any thoughts would be great
Thanks
Eric
I am curious what guys who are building theaters on the second floor are doing with their sub floor. My second floor "bonus" room is actually ~950ft/sq with 15'x20.5'x9 of it, the theater area. The area is stud only with the "exterior" walls sheeted into the attic area. The walls are obviously sitting on the sub-floor, which is 1 1/8" Advantech. Sound transmits quite easily to the bottom floor at this point. Oh, the cavity is insulation filled, however, i know this does basically nothing. Removing the sub-floor is not an option. Will using Green Glue between another layer of 3/4" sub-floor (or two?) going to do a nice job? I am thinking of Whisper Clips on the walls and ceilings to help isolate the existing walls from the hard attachment to the existing floor.
Any thoughts would be great
Thanks
Eric
















[/url]

