After playing around with the layout a little more (based on feedback I have received) here is the latest version.

The IB chamber is a little small at about 5x Vas for (4) subs but I still think it will be ok. I plan to stuff some insulation in the and try and bump that number a little. This layout also opens up a little room up front between the main speakers for additional subs if I find that the IB just isn't enough (hope that isn't the case but it never hurts to have room to expand
).
I shared half of the foot of space that I gained with the workout room and used the other to shift everything (screen and seats) forward in the room to get the second row a little farther off the back wall. I'm clear of the back wall by about 14" now. Not sure I want to sacrifice pushing things forward more at the expense of viewing distance (front row) from the screen. Current front row viewing distance is 11'-6" from a 130" wide screen.

The IB chamber is a little small at about 5x Vas for (4) subs but I still think it will be ok. I plan to stuff some insulation in the and try and bump that number a little. This layout also opens up a little room up front between the main speakers for additional subs if I find that the IB just isn't enough (hope that isn't the case but it never hurts to have room to expand
).I shared half of the foot of space that I gained with the workout room and used the other to shift everything (screen and seats) forward in the room to get the second row a little farther off the back wall. I'm clear of the back wall by about 14" now. Not sure I want to sacrifice pushing things forward more at the expense of viewing distance (front row) from the screen. Current front row viewing distance is 11'-6" from a 130" wide screen.
















). Also thought about cutting up the pink sheathing and filling each cavity with that but that would be more trouble than it's worth I think. I have a large pile of insulation that I pulled off the top 2 feet of the concrete walls that I can use. Plan to frame the walls around the perimeter and then stuff more of this insulation into those cavities to help bring up the R value. Will have 6-8 inches of insulation around the top of the foundation so I think that should be sufficient.

its a small price to pay for cost savings in the long run. I know you said you used some cans of foam but I can see from your pictures that the insulation is discolored from the dust and dirt filtering through. Nows the time to do while its all open. I did mine after framing the entire basement so I could spray and seal the rim joist board with the space above. Here is a photo note this is not in the theater and I filled these 3 spots alot more then the rest of the basement as the tanks were almost empty and want to use it up.