Quote:
Originally Posted by
Reservoir Dog 
Great thread, the house is looking great, I would like to see some more photos of the progress if you don't mind?
Thanks. I will most some picks in a few weeks. I am tearing up the entire 2nd floor starting on April 8th and will take us into mid to late summer. We will be installing the lighting for the second floor, paneling, fireplace, stone flooring throughout (I am putting down First Choice Italian Alabastrino travertine), projector, screen, new plasma, etc. The second floor has been delayed because I changed where I am sourcing the paneling from. I am looking for something more formal than what I did in the Master.
As far as the Master goes it's 99% done. I am still waiting for bedding and window treatments to come in It's been over 6 months and I am told they should be here with in 2-3 weeks)
In the mean time, here are a few pics of what we are putting in.
Alabastrino Travertine (This is the actual stone we are using. I was at the stone yard on Wed, putting this together and I took this pic).
Actual Chandelier (I am putting in 2 of these). The in-ceiling lighting will be the same Elco 3" Nickel lighting as in the rest of the house.

In-Celling 3" Elco Lighting (This is a pic of the Master Bedroom Ceiling)
Actual Paneling - Here is a small mock up of the paneling we are putting up in the great room. Note that it's not to scale it's actually much larger. The second pic shows the paneling actual size BUT is NOT what we I am doing as far as color goes. I am not doing Gold on White. I am doing the stained wood you see below.

Full Size Paneling
Fireplace
When the Master Bedroom Window treatments and bedding arrive I will post those pics. I may also post pics of the progress on the 2nd floor if I remember to take pics.
Any questions let me know.
Edited by GoGo Delicious - 3/15/13 at 9:29am