Alabama Build

post #1 of 47
Thread Starter 
Day 1.
Started from existing framing on Tuesday. Installed the isolation floor, clips, channel, insulation, ran the rough electrical and HVAC. Day 2 will be sheet rock with GG
700
700
359
post #2 of 47
Dennis-

Are you on-sight for this one? Thanks.
post #3 of 47
Thread Starter 
My partner and staff are on site at the moment. I am in the office getting the rack built and wired (and, unlike several "we'll build it for you" outfits, we're actually licensed, bonded, and insured for this kind of work ... in more than one state).
post #4 of 47
Quote:
Originally Posted by Dennis Erskine View Post

Day 1.
Started from existing framing on Tuesday. Installed the isolation floor, clips, channel, insulation, ran the rough electrical and HVAC. Day 2 will be sheet rock with GG.

What took me a month gets done in a day! Dennis, your people put us DIYers to shame. biggrin.gif
post #5 of 47
@ Dennis

Agreed. I'm looking forward to watching this unfold. I enjoy what you and your team do.
post #6 of 47
I always appreciate you sharing your work with us.
post #7 of 47
The spacing for the clips and channel on the ceiling "looks" closer than 24", is it just an optical illusion or done for acoustical reasons specific to this room?
post #8 of 47
I suspect that they are doing another of those beautiful wood coffered ceilings and the spacing reflects the anticipated load.
post #9 of 47
Quote:
Originally Posted by BIGmouthinDC View Post

I suspect that they are doing another of those beautiful wood coffered ceilings and the spacing reflects the anticipated load.
Good call, I didn't even think about that
post #10 of 47
Can you share where in Alabama this is?
post #11 of 47
Thread Starter 
End of day 2. Sheet rock complete, equipment closed framed, HVAC extensions framed in.
Location, Montgomery.

359

700
post #12 of 47
Can you post your design and layout so we can see it come together? Love watching your work and HT skills, especially when they are such quick builds!
post #13 of 47
Is that sheetrock hung and taped?!?

138

By the way Dennis, I noticed that there is a window in the room. What are your plans for that?
Edited by aaustin - 6/28/12 at 6:38am
post #14 of 47
Day 2 = Month 5 for me...of course, there's probably more than just one guy working in there (at least I hope so).

Excited to see what you do with this one!
post #15 of 47
Thread Starter 
Quote:
By the way Dennis, I noticed that there is a window in the room. What are your plans for that?

The window is in the equipment room.
No, I will not post the plans. Sorry.
post #16 of 47
Quote:
Originally Posted by Dennis Erskine View Post

The window is in the equipment room.

Thanks Dennis. Are you going to do some kind of plug to preserve your sound isolation since it looks like the rack will be open into the equipment room (I'm guessing that's what the opening in your previous pic is) or is that small area not really a big deal?
post #17 of 47
Thread Starter 
The rack will not be open to the equipment room. There will be access; but, it will not be open.
post #18 of 47
Quote:
Originally Posted by Dennis Erskine View Post

No, I will not post the plans. Sorry.
Completely understandable. How about just the room dimensions? Looks like it could be a large room from the pics.
post #19 of 47
Thread Starter 
Quote:
How about just the room dimensions?
23'-10" x 16' x 9'
Quote:
Is that sheetrock hung and taped?!?
Mostly. Taping/mudding will finish today (we may have it sealed as well ... depends on temps)
Should have pictures tomorrow showing progress on platforms/stage.

This is not our first dance, so we've worked out a system that out runs everyone. On more than one occasion, we've had to seal the room because we were done and the rest of the project was not.
On this trip, you will not see soffits, coffers, columns. We will take very precise "as built" measurements and build those items in our shop where we have our millwork equipment and paint booth and we have more control over the quality of the end result. We are also very anal about quality. If something isn't right, or the millwork expands/contracts we do return to fix it on our dime (call backs are very rare, however). A high quality end result reduces the risk of a call back. The speed is just a product of: (1) wanting to go home to see families; and, (2) after 15 years of doing it, we kinda know what to do. smile.gif

OTOH, if the project is in Fiji, Tonga, St. Kitts or the Cayman Islands, we may leave a booboo or two so we have to come back. smile.gif
post #20 of 47
I'm staying tuned on this one. Looks like a promising start. Good luck Dennis!
post #21 of 47
Thread Starter 
Day Three -
Sheet rock in equipment area and closet completed. Sealing/priming today. Seating platform and stage pre-cut and ready for installation. We forgot to leave drywall dust all over everything. smile.gif BTW, the door you see in the picture is a temporary door. We'll manufacture one of our 300lb isolation doors back in our shop with the rest of the interior elements. Home for the weekend.

700

359

359
Edited by Dennis Erskine - 6/29/12 at 4:45am
post #22 of 47
Thread Starter 
Day Four - Scorcher! Working in 100+ temps not a good thing. Steve and crew are home for the weekend. Platform finished, stage framed. Back at it Monday (usually we work through the weekend; but, it is not allowed here and with the heat, not safe either.)

The platform will have a small knee wall in front of it...inside the knee wall on a far side, a retractable flat panel TV.

359
post #23 of 47
Sweet! I'm excited to see how the retractable TV turns out.
post #24 of 47
Thread Starter 
Short day on Monday. Today we'll spray the primer coat, install the soffit supports, laser the room and be back in Atlanta for the 4th. After the 4th we'll be installing our custom acoustic door, install the softits and prep the room for the interior finishes and trim. The interior finishes will be built in our Atlanta shop while we wait for the home to be ready to move in (we don't want "stuff" installed until the home is occupied). The rack is built and as we wire, we'll post pictures.

359

359
post #25 of 47
Thread Starter 
So on the fifth work day ... installed all the cleats for the ceiling coffers and soffits and blasted the room with a primer/seal coat. Once the house is a bit further along, we'll return (next week or the week after) to install the doors, soffits, low voltage wiring, and coffers. Then it is wait for move in day to lay the carpet, trim, lights, treatments, fabric and equipment.

359

359
post #26 of 47
When you "laser the room" you're making a 3D model to prep for woodwork? or for acoustic modeling? or something else entirely?
post #27 of 47
You laser mark and square for all the finish carpentry clearances, molding heights, etc. - essentially a very high-precision way to map out the room design in the rough room to make sure everything is as perfect and as square as possible for when the finish carpentry is made offsite and installed.
post #28 of 47
You guys work fast! Enjoy the fourth.

Bud
post #29 of 47
Hey Dennis. What width screen are you using for this one? I assume 2.35:1 is what you will be using.
post #30 of 47
Thread Starter 
129 wide, 2.35:1