I am about 5 weeks out from doing the low voltage rough-in in my new house and had some questions for the gang here at AVS:
I'm going to be running 1" carlon orange conduit from all my LV boxes to a structured wiring panel. My wiring panel will chase to the attic where necessary and I was wondering what the best practice/code compliant method was for reducing my 1" conduit runs down to the chase. Will I need a junction box somewhere in the attic? Can I just leave the 1" conduits open ended somewhere near the chase(s)?
I'm going to be running 1" carlon orange conduit from all my LV boxes to a structured wiring panel. My wiring panel will chase to the attic where necessary and I was wondering what the best practice/code compliant method was for reducing my 1" conduit runs down to the chase. Will I need a junction box somewhere in the attic? Can I just leave the 1" conduits open ended somewhere near the chase(s)?











