Although it seems I'm nearly finished still lots to do:
1) Switch/Receptacle covers
2) Bar Lights
3) Stage Light
4) Crown moulding + Rope Light
5) Star Ceiling (got the light box & Fibres)
6) Tidy the Cat 5e and RG6 in equip closet (waiting to see what gets install for FiOS & TV)
7) Equipment Rack
8) Equipment Closet Door / Faux Ticket Booth
9) Bar Cabinets, Counter, Sink and Beverage Cooler
10) Bar overhead canopy with custom frosted glass
11) Bar hardwood flooring
12) Base Moulding (sitting in Garage)
13) Stain and paint the HT Entrance Door
14) Cover Proscenium (Got the black Dazian Expo cloth)
15) Seating (ordered ETA before christmas

)
16) Base Shakers (already purchased)
17) Stero Receiver to drive Bass Shakers
18) Screen - probably DIY SMX
19) Possible rear sound in-ceiling speakers
20) Movie Posters, Lithographs and British Pub pics.
This weekend got to rip out a fireplace a prepare for new one so possible not much will get done in HT.....however got all next week off :
Cheers,
Mark