After over a year of my incorrect equipment list sitting on the front page I decided I needed to update it with what I am actually using so any references to equipment in following posts should now read as follow:
Sanyo PLV-Z4 projector
Onkyo 606 Receiver
(2) Paradigm Monitor 7s
(1) Ascend CMT-340C
(4) Ascend HTM-200s for surrounds
(1) HSU VTF2 Mk3
Mount from Bestpricemounts.com
DIY anamorpic lense
Pfifer Sheerweave 2.35 AT screen (10' wide)
BR player (yet to be purchased but hopefully soon and not sure which yet)
As you can see on the floor plan I have decided to go with the room that is 11 x 21. I was originally going to use the room where the new model railroad is going to go now. All my AV equipment will go in the AV closet next to the bathroom which will double as a fake ticket office. I still have an area i the lower right of the plan that I am unsure of what to do with. I am thinking that is can be storage for DVDs and XBOX games.
I am ordering my PJ on Monday and will begin the framing next weekend. I still need to pull my permits since there is going to be a dedicated 100A subpanel for the basement in the model railroad room. There is a lot to frame since the only existing interior walls right now are the stair walls. I should be able to frame up all walls in 2 weekends and another 2 for all the soffit work max.
Once I get the electrical panel in and inspected I will start wiring the HT and once I get that inspected I will sheetrock the HT, hall and bathroom. I plan on using Lutron swithes for the HT lighting. If all goes well I will be complete (with the HT , hall and bath at least) prior to kickoff for the 1st pre-season game, although I plan on watching my Superbowl Champ Pittsburgh Steelers in Charlotte that day.
Here are a couple pictures of the existing view towards the screen and the view towards the back wall so you can see what it looks like now.
I am working on a rendering of the space in a couple minutes and should have a nice image to post tomorrow. Any comments on my plan are appreciated
After over a year of my incorrect equipment list sitting on the front page I decided I needed to update it with what I am actually using so any references to equipment in following posts should now read as follow:
Sanyo PLV-Z4 projector
Onkyo 606 Receiver
(2) Paradigm Monitor 7s
(1) Ascend CMT-340C
(4) Ascend HTM-200s for surrounds
(1) HSU VTF2 Mk3
Mount from Bestpricemounts.com
DIY anamorpic lense
Pfifer Sheerweave 2.35 AT screen (10' wide)
BR player (yet to be purchased but hopefully soon and not sure which yet)
As you can see on the floor plan I have decided to go with the room that is 11 x 21. I was originally going to use the room where the new model railroad is going to go now. All my AV equipment will go in the AV closet next to the bathroom which will double as a fake ticket office. I still have an area i the lower right of the plan that I am unsure of what to do with. I am thinking that is can be storage for DVDs and XBOX games.
I am ordering my PJ on Monday and will begin the framing next weekend. I still need to pull my permits since there is going to be a dedicated 100A subpanel for the basement in the model railroad room. There is a lot to frame since the only existing interior walls right now are the stair walls. I should be able to frame up all walls in 2 weekends and another 2 for all the soffit work max.
Once I get the electrical panel in and inspected I will start wiring the HT and once I get that inspected I will sheetrock the HT, hall and bathroom. I plan on using Lutron swithes for the HT lighting. If all goes well I will be complete (with the HT , hall and bath at least) prior to kickoff for the 1st pre-season game, although I plan on watching my Superbowl Champ Pittsburgh Steelers in Charlotte that day.
Here are a couple pictures of the existing view towards the screen and the view towards the back wall so you can see what it looks like now.
I am working on a rendering of the space in a couple minutes and should have a nice image to post tomorrow. Any comments on my plan are appreciated





























to work on the yard and around the house on other things that were lower priorities during the heat of summer.