The Exascale Cinema - AVS Forum | Home Theater Discussions And Reviews
Forum Jump: 
 11Likes
  • 1 Post By AlienWarlock
  • 1 Post By AlienWarlock
  • 1 Post By AlienWarlock
  • 1 Post By BllDo
  • 2 Post By AlienWarlock
  • 2 Post By AlienWarlock
  • 3 Post By AlienWarlock
 
Thread Tools
post #1 of 26 Old 01-03-2018, 06:44 PM - Thread Starter
Member
 
AlienWarlock's Avatar
 
Join Date: Oct 2017
Posts: 40
Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 9 Post(s)
Liked: 16
The Exascale Cinema

Hello and welcome to my build thread. I have always enjoyed browsing build threads here on AVS so I thought it was time to do my own. I actually completed this build more than a year and a half ago so this will be a build retrospective. Since all of really good theaters featured in build threads have a cool name, I felt that I couldn't do a build thread until I came up with a name. So here it is... The Exascale Cinema.

I have been in my house a little over three years now. While the house was just over 10 years old when I moved in, I did many renovations and improvements to include finishing the basement and building the theater as part of that process. While not as elaborate as many builds featured here, I was able to do quite a bit with the space that I had available. I was able to keep the budget down by using some components already on hand from the theater at my last place. Hopefully in my next place I can do something more elaborate with a dedicated space and larger budget, but the Exascale Cinema is rocking it right now!

Attached is the floor plan for the walls that I put up in my basement. I just whipped it up in MS Word so don't expect it to be to scale. The basement in my house was completely unfinished which allowed me to set it up in the configuration that I wanted. There are spaces for the theater, general entertaining, a wood shop, an electronic shop, and a large storage room.

Equipment List:
Panasonic PT-AE8000U projector
Saaria 100" 16x9 screen
Yamaha RX-V863 receiver
Monolith Air Motion Center and Main speakers
Sony SS-MB150H Surrounds and Rear speakers
Monolith 10" 500 Watt Powered Subwoofer
Kaleidescape M700 disc vault
Kaleidescape 1U server
Kaleidescape K5000 player (music zone)
Oppo BDP-103 Blu-ray player
Tivo Premiere
Nuvo E6GM + E6GX wha (12 zones total)
Nuvo MPS4 music port, T2SIR tuner & RIPD ipod dock
Middle Atlantic Slim 5-29 rack


More to come...
Attached Thumbnails
Click image for larger version

Name:	floor plan.png
Views:	946
Size:	22.9 KB
ID:	2339880  

Last edited by AlienWarlock; 05-01-2019 at 09:32 PM.
AlienWarlock is offline  
Sponsored Links
Advertisement
 
post #2 of 26 Old 01-03-2018, 09:31 PM - Thread Starter
Member
 
AlienWarlock's Avatar
 
Join Date: Oct 2017
Posts: 40
Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 9 Post(s)
Liked: 16
saving this space

saved for later
AlienWarlock is offline  
post #3 of 26 Old 01-03-2018, 10:36 PM - Thread Starter
Member
 
AlienWarlock's Avatar
 
Join Date: Oct 2017
Posts: 40
Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 9 Post(s)
Liked: 16
Chapter 1 - Prep work for walls

Here is the floor plan from the first post embedded as an image (dashed lines indicate the walls that were put up):



The best part about this basement is its a walk out as seen by the door and two windows on the right. The next best thing is that it is completely dry with no water problems. The third best thing was that there were not too many of the normal basement obstructions to work around in what became the living space. Beyond that.... It was challenging. As with most basements under two story houses, I wish it had just a little more space.

Before Pictures:
1. Looking down towards where the screen will go (sheets of foam on the screen wall):



It should be noted here that you don't see any duct work along the stair hall, parallel to the gas pipe, leading to where the projector and screen will go. This was not always the case. In fact my first big challenge was to re-route the duct work around the stair hall on the other side as seen in this picture. What happened with the original installers was that they had to go around the stair hall and they picked the easier way instead of the slightly harder way which would have put the duct work next to the I-beam as it should be.

2. Looking across the theater to where the storage closet will go (with an early test of electronic shop in that space):



3. Looking into what will be the electronic shop towards the left:



4. Looking into where the rack will go (under the re-routed ductwork), next to the stairs. Some structured wiring is visible - more on that later:



5. Looking into the wood shop from the electronic shop. These two spaces will later be walled off:



6. Looking out from the wood shop under the stairs. The 45 degree offsets for the supply duct were flipped to make the duct go around the stair hall to the left instead of the right. The return duct had to be moved and have its panning extended across the top of the supply duct since it originally came up on the left side.

Attached Thumbnails
Click image for larger version

Name:	IMG_20150726_235118.jpg
Views:	839
Size:	172.5 KB
ID:	2340044   Click image for larger version

Name:	IMG_20150726_235131.jpg
Views:	836
Size:	164.1 KB
ID:	2340046   Click image for larger version

Name:	IMG_20150726_235151.jpg
Views:	820
Size:	133.3 KB
ID:	2340048   Click image for larger version

Name:	IMG_20150726_235214.jpg
Views:	822
Size:	142.8 KB
ID:	2340050   Click image for larger version

Name:	IMG_20150726_235259.jpg
Views:	808
Size:	141.9 KB
ID:	2340052  

Click image for larger version

Name:	IMG_20150726_235321.jpg
Views:	803
Size:	183.2 KB
ID:	2340054  

Last edited by AlienWarlock; 12-17-2018 at 07:39 PM.
AlienWarlock is offline  
Sponsored Links
Advertisement
 
post #4 of 26 Old 01-04-2018, 05:54 PM - Thread Starter
Member
 
AlienWarlock's Avatar
 
Join Date: Oct 2017
Posts: 40
Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 9 Post(s)
Liked: 16
Chapter 2 - Structured Wiring

Once the ductwork was fixed and before I charged into the basement wall framing, I took time to complete the structured wiring. As seen in the previous pictures there were quite a few wires hanging down on the stair hall wall. To facilitate getting wires to the upstairs bedrooms, I had installed a total of 8 1" smurf tube conduits from basement to attic. The stair hall wall was was continuous from the first floor to the attic. I was able to drill up into the first floor wall from the basement and drill down into the second floor wall from the attic. To meet in the middle, I had to make a cut in the drywall inside one of the second floor bedroom closets. From the hole that I cut I was able to drill down through the second floor bottom plate and then through the top plate of the first floor. Once that was done, snaking the flexible conduits down into the wall from the attic was pretty easy.

With the conduit in place, I then started pulling wire. In each bedroom, I put two wall jacks each with 2x CAT6 and 1x RG6QS cables. I used a 1000' spool of Belden 7961A quad shield coax with solid copper center conductor and 2x 1000' reels of Coleman CAT6 cable from the box store. I know there is much debate over the necessity of CAT6 over CAT5e since CAT6 can't do 10Gbps to the full 100M like CAT6A. Regardless, I decided to go with CAT6 for my Ethernet jacks given it can do 10Gbps over short distances and the potential for using it for non-Ethernet applications like HDMI over twisted pair that would benefit from the extra bandwidth of CAT6.

I also pulled speaker cable and CAT5 cable to each bedroom in order to support having a speaker in the ceiling and a control pad for the whole house audio system. When I got done pulling wires to the wiring panel I had a total of 81 cables of various flavors that end up there. As I was pulling cables I recorded each run in an Excel spreadsheet to keep track of how long the run was, how much of the remaining cable was left on the spools, and where the cable was terminated. Below is a screen shot of part of that spreadsheet.



With the wires all in place, it was time to put up a piece of 3/4" plywood backer board which was painted gun metal grey.



And now the fun begins with lacing up the patch panels:





Attached Thumbnails
Click image for larger version

Name:	wiringSpreadsheet.png
Views:	749
Size:	49.5 KB
ID:	2340378   Click image for larger version

Name:	IMG_20150804_232802.jpg
Views:	751
Size:	173.4 KB
ID:	2340382   Click image for larger version

Name:	IMG_20150804_170043.jpg
Views:	760
Size:	174.0 KB
ID:	2340384   Click image for larger version

Name:	IMG_20150730_214911.jpg
Views:	758
Size:	117.7 KB
ID:	2340386   Click image for larger version

Name:	IMG_20150805_232011.jpg
Views:	760
Size:	145.7 KB
ID:	2340390  


Last edited by AlienWarlock; 01-04-2018 at 05:58 PM.
AlienWarlock is offline  
post #5 of 26 Old 01-05-2018, 06:34 PM - Thread Starter
Member
 
AlienWarlock's Avatar
 
Join Date: Oct 2017
Posts: 40
Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 9 Post(s)
Liked: 16
Chapter 3 - Framing the Walls

With the structured wiring under control, it was finally time to put up the walls. After putting up 2" foam against the concrete walls, a friend came over to help with the framing. In the space of about 12 hours we were able to get almost 75% of the walls up.

Foam over the concrete (note my old projector on the ceiling used for tests):





First wall up (screen wall):








The storage room:



The walls between the electronic shop and the storage room (these were taken a little bit later with the wiring already installed):



The door to the electronic shop and rack opening in the wall. The temporary rack is sitting behind the opening and the Slim 5 is waiting on the floor:



The door to the wood shop. The area to the right will have a counter top and cabinets:

Attached Thumbnails
Click image for larger version

Name:	IMG_20151221_100343.jpg
Views:	711
Size:	128.9 KB
ID:	2341080   Click image for larger version

Name:	IMG_20151221_100352.jpg
Views:	710
Size:	140.6 KB
ID:	2341082   Click image for larger version

Name:	IMG_20160106_225906.jpg
Views:	717
Size:	134.3 KB
ID:	2341098   Click image for larger version

Name:	IMG_20160106_225859.jpg
Views:	706
Size:	158.4 KB
ID:	2341100   Click image for larger version

Name:	IMG_20160106_225851.jpg
Views:	708
Size:	141.3 KB
ID:	2341102  

Click image for larger version

Name:	IMG_20151222_000617.jpg
Views:	707
Size:	147.3 KB
ID:	2341106   Click image for larger version

Name:	IMG_20151222_000606.jpg
Views:	713
Size:	148.3 KB
ID:	2341108   Click image for larger version

Name:	IMG_20151222_000555.jpg
Views:	712
Size:	175.2 KB
ID:	2341110   Click image for larger version

Name:	IMG_20151221_141435.jpg
Views:	721
Size:	142.7 KB
ID:	2341126  
femi likes this.

Last edited by AlienWarlock; 01-15-2018 at 06:09 PM.
AlienWarlock is offline  
post #6 of 26 Old 01-11-2018, 07:16 PM - Thread Starter
Member
 
AlienWarlock's Avatar
 
Join Date: Oct 2017
Posts: 40
Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 9 Post(s)
Liked: 16
Chapter 4 - A note about the cabinet wall

While designing the layout of the walls, I decided that I wanted a row of kitchen cabinets along the stair wall. The design needed to include space for a mini fridge and a microwave. So the challenge now was to figure out what size cabinets I needed to buy and then make the wall opening to match. I already knew that I wanted to add a 'wing wall' at the bottom of the steps to hide the right side of the cabinets. A matching wing wall on the left side where the cabinets meet the diagonal wall with the door to the wood shop establishes the space for the cabinetry. This could have been anywhere between 10'-12.5' based on the length of the stair hall wall. I settled on 11' by a combination of 2 ea 36" wide cabinets and 2 ea 30" wide cabinets.



I searched around online and found a cabinet supplier that offered free use of the 20/20 kitchen design tool. This let me visualize the design and ensure that I could match the required components with what was available as stock cabinetry as the local big box store. Here is a screen shot of the design that I made:



The final configuration for the upper cabinets was 36" + 30" (microwave) + 30" + 36". The base cabinets are 12" + (24" fridge opening) + 30" + 30" + 36".
Attached Thumbnails
Click image for larger version

Name:	IMG_20160203_190838.jpg
Views:	634
Size:	140.3 KB
ID:	2344304   Click image for larger version

Name:	basement kitchen.png
Views:	635
Size:	488.2 KB
ID:	2344306  
AlienWarlock is offline  
post #7 of 26 Old 01-15-2018, 07:03 PM - Thread Starter
Member
 
AlienWarlock's Avatar
 
Join Date: Oct 2017
Posts: 40
Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 9 Post(s)
Liked: 16
Chapter 5 - Drywall

Once all of the framing, electrical wiring, speaker wiring, etc. was complete, I began to hang the wall board. I had about 7'8" from the floor to the bottom of the floor joists so I opted to install the drywall vertically and removed a small amount from the top of each board. I didn't do any sound proofing beyond installing fiberglass insulation behind the walls. I am saving that for my next house Hanging the drywall was kind of fun and it was satisfying to see the room start to emerge.

50 sheets of drywall please (screen wall):


The opening in the wall for the rack:




The door to outside:


The door to the wood shop:


The cabinet wall:


The soffit to conceal duct work:


Looking back towards the stairs (the rack was also doing a test fitting here):
Attached Thumbnails
Click image for larger version

Name:	IMG_20160120_215747.jpg
Views:	586
Size:	140.0 KB
ID:	2346244   Click image for larger version

Name:	IMG_20160209_222531.jpg
Views:	558
Size:	106.4 KB
ID:	2346246   Click image for larger version

Name:	IMG_20160209_222540.jpg
Views:	565
Size:	107.1 KB
ID:	2346248   Click image for larger version

Name:	IMG_20160209_222612.jpg
Views:	565
Size:	115.4 KB
ID:	2346254   Click image for larger version

Name:	IMG_20160209_222512.jpg
Views:	572
Size:	111.5 KB
ID:	2346258  

Click image for larger version

Name:	IMG_20160209_222632.jpg
Views:	583
Size:	99.2 KB
ID:	2346260   Click image for larger version

Name:	IMG_20160312_173408.jpg
Views:	590
Size:	127.7 KB
ID:	2346262   Click image for larger version

Name:	IMG_20160312_173426.jpg
Views:	582
Size:	127.5 KB
ID:	2346264  
femi likes this.
AlienWarlock is offline  
post #8 of 26 Old 01-16-2018, 08:15 PM - Thread Starter
Member
 
AlienWarlock's Avatar
 
Join Date: Oct 2017
Posts: 40
Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 9 Post(s)
Liked: 16
Chapter 6 - Drywall finishing

And now things start to come together... I decided that I was going to farm out the drywall finishing. It was probably the best decision I made on the whole project. It took a while but I found a really good drywall guy who did my project as a side job. Before he got started, he advised me to put more screws in my wall board. He also complimented me on having put almost every screw in at sufficient depth in the drywall, high praise indeed! It took him almost 3 days to do the mud & tape along with a primer coat of paint.

The drywall guy with his tool that applies mud to the tape automatically:


The tool was called a 'bazooka'. Here is the pump that loads it up with mud:


















Attached Thumbnails
Click image for larger version

Name:	IMG_20160314_110016.jpg
Views:	538
Size:	146.3 KB
ID:	2346870   Click image for larger version

Name:	IMG_20160314_132514.jpg
Views:	542
Size:	120.5 KB
ID:	2346872   Click image for larger version

Name:	IMG_20160314_133452.jpg
Views:	538
Size:	122.3 KB
ID:	2346874   Click image for larger version

Name:	IMG_20160315_213522.jpg
Views:	538
Size:	105.6 KB
ID:	2346876   Click image for larger version

Name:	IMG_20160315_213547.jpg
Views:	536
Size:	118.3 KB
ID:	2346878  

Click image for larger version

Name:	IMG_20160315_213635.jpg
Views:	537
Size:	94.1 KB
ID:	2346880   Click image for larger version

Name:	IMG_20160316_181307.jpg
Views:	539
Size:	124.4 KB
ID:	2346882   Click image for larger version

Name:	IMG_20160317_102852.jpg
Views:	533
Size:	117.8 KB
ID:	2346884   Click image for larger version

Name:	IMG_20160317_105452.jpg
Views:	522
Size:	95.2 KB
ID:	2346886   Click image for larger version

Name:	IMG_20160321_074436.jpg
Views:	539
Size:	100.8 KB
ID:	2346888  

Click image for larger version

Name:	IMG_20160321_074448.jpg
Views:	532
Size:	106.3 KB
ID:	2346890  
femi likes this.
AlienWarlock is offline  
post #9 of 26 Old 01-17-2018, 06:46 AM
Advanced Member
 
Spyderturbo007's Avatar
 
Join Date: Oct 2005
Posts: 645
Mentioned: 13 Post(s)
Tagged: 0 Thread(s)
Quoted: 239 Post(s)
Liked: 98
It looks great!!

I have a question about your rack. It looks like you have an opening in the wall for an exposed rack. I see that your rack has the plate that extends forward at the bottom. How are you going to handle pushing that against the wall, or are you going to cut off the plate at the bottom?

I have a very similar rack and haven't decided what direction I want to to yet.

Attached Thumbnails
Click image for larger version

Name:	Plate.jpg
Views:	539
Size:	159.8 KB
ID:	2347022  
Spyderturbo007 is offline  
post #10 of 26 Old 01-18-2018, 06:20 PM - Thread Starter
Member
 
AlienWarlock's Avatar
 
Join Date: Oct 2017
Posts: 40
Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 9 Post(s)
Liked: 16
Quote:
Originally Posted by Spyderturbo007 View Post
It looks great!!

I have a question about your rack. It looks like you have an opening in the wall for an exposed rack. I see that your rack has the plate that extends forward at the bottom. How are you going to handle pushing that against the wall, or are you going to cut off the plate at the bottom?

I have a very similar rack and haven't decided what direction I want to to yet.
Hello and thanks for your comments. The rack that you circled in the picture was not the one I ultimately used. You can see in that picture another rack off to the right. I was originally going to utilize the old relay rack by cutting down the height and mounting into a wall opening. But I decided that it would look hacked up no matter what I did. So I decided to just go with a different rack better suited for the job. I found a used Middle Atlantic Slim 5-29 rack on Amazon that would work perfectly for what I wanted to do. I framed the opening just large enough for it to fit and then installed it so it would be flush with the trim boards. I will be posting the pictures of the finished rack in the coming days. Stay tuned!

Attached Thumbnails
Click image for larger version

Name:	0002964_328.jpeg
Views:	485
Size:	7.0 KB
ID:	2347878  
AlienWarlock is offline  
post #11 of 26 Old 01-19-2018, 12:42 PM
Member
 
Join Date: Aug 2017
Location: Indianapolis, IN
Posts: 50
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 7 Post(s)
Liked: 4
Quote:
Originally Posted by Spyderturbo007 View Post
It looks great!!

I have a question about your rack. It looks like you have an opening in the wall for an exposed rack. I see that your rack has the plate that extends forward at the bottom. How are you going to handle pushing that against the wall, or are you going to cut off the plate at the bottom?

I have a very similar rack and haven't decided what direction I want to to yet.

I will be doing the same thing in my basement with the same rack.. i should have pictures posted in a week or 2
David Blosser is offline  
post #12 of 26 Old 01-19-2018, 12:57 PM
AVS Forum Special Member
 
BllDo's Avatar
 
Join Date: Nov 2010
Location: Twin Cities
Posts: 2,084
Mentioned: 20 Post(s)
Tagged: 0 Thread(s)
Quoted: 658 Post(s)
Liked: 470
These pictures are obviously fakes. No workspace in history of humanity has ever been this clean during a project. Nope, not buying it.

Are you doing a drop ceiling in the space?
Tedd likes this.

-

Nothing in this world will tick you off more than seeing a vegetarian eating pudding.
BllDo is offline  
post #13 of 26 Old 01-19-2018, 01:42 PM
Advanced Member
 
rfbrang's Avatar
 
Join Date: Jun 2011
Location: Upstate NY
Posts: 715
Mentioned: 4 Post(s)
Tagged: 0 Thread(s)
Quoted: 266 Post(s)
Liked: 86
Wow, great start. Nice tight framing to the ductwork, never thought to put scrap wood up in the joist bays. Welcome to AVS!!!

Our Old Space
New House
PSN: brotj7
rfbrang is offline  
post #14 of 26 Old 01-20-2018, 05:42 AM
Advanced Member
 
femi's Avatar
 
Join Date: Jan 2009
Location: Acworth, GA
Posts: 646
Mentioned: 19 Post(s)
Tagged: 0 Thread(s)
Quoted: 239 Post(s)
Liked: 294
wow @AlienWarlock your basement is extra clean, my is full of junk.
Can't wait to see how your theater turn out.
Good job so far.

Femi

(2)JTR Cap 4000's---(6) Enclosures Seal SI HT-18's---Behringer iNUKE 6000DSP--- Behringer iNUKE 3000DSP---Denon AVR-4250CI---(3)JBL 4722n---(5)Behringer Eurolive B215XL---(2)Klipsch SS-1 Surround---JVC RS500---Sony HW50es---VApex Fixed frame 135" 16:9---Sony UBP-X800---Oppo BDP-93---Toshiba HD DVD-XA2---Xbox 360---PS4---HDFURY Linker---Darbee Darblet DVP-5000---miniDSP Balanced 2x4---Harmony 1100 remote
femi is offline  
post #15 of 26 Old 01-23-2018, 09:44 PM - Thread Starter
Member
 
AlienWarlock's Avatar
 
Join Date: Oct 2017
Posts: 40
Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 9 Post(s)
Liked: 16
Thanks for the compliments. I suppose the photos were staged to hide the junk The wood in the joist bay was a bunch of garbage left by the previous owner that eventually was sent to the burn pile. But I did replicate the concept in the wood shop. And here are some more pictures of the rack progress since that seems to be the most popular feature of this thread so far.

The rack installed in the wall opening and components going in. I used a standard rack shelf flipped upside down to hold the non rack mountable receiver:


Here I'm holding up a piece of window casing to set the proper depth of the rack in the wall. I later had to take out the Monoprice whole house amps and mod them with a resistor in the power feed line of the blue LEDs. They were way too bright!


The back of the rack. The rats nest will be cleaned up later!


Here I began the drop ceiling after the wall paint was finished. I only took this one picture of that process unfortunately. I hung the screen so that I could get the first main rail of the ceiling centered on the screen. In retrospect, I was lucky not to poke a hole in the screen during the ceiling installation.
Attached Thumbnails
Click image for larger version

Name:	IMG_20160321_214253.jpg
Views:	354
Size:	110.5 KB
ID:	2350400   Click image for larger version

Name:	IMG_20160321_214337.jpg
Views:	361
Size:	139.6 KB
ID:	2350402   Click image for larger version

Name:	IMG_20160321_214402.jpg
Views:	360
Size:	185.0 KB
ID:	2350404   Click image for larger version

Name:	IMG_20160530_223305.jpg
Views:	354
Size:	140.4 KB
ID:	2350406  
AlienWarlock is offline  
post #16 of 26 Old 02-12-2018, 08:57 PM - Thread Starter
Member
 
AlienWarlock's Avatar
 
Join Date: Oct 2017
Posts: 40
Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 9 Post(s)
Liked: 16
Chapter 7 - Installing Cabinets and Trim

Once the drywall was completed, the walls painted, and the drop ceiling installed, the project was headed for the final stretches. The installation of the row of cabinets was first. I went with 'Glenwood' Beech cabinets that were in stock for about $1,000 at the local Menards.



Here is the walk-out with the tile landing area in front of the door. I screwed a piece of 1/4" cement board to the concrete with tapcon screws and then used thinset mortar for the tiles.


Closeup of the door tile with the baseboards, aluminum trim/carpet tack strip, door casing and window ledges installed.


Here is the screen wall with the rolls of carpet pad ready to be installed. I haven't mentioned the lights before but this picture seems like a good place to do so. I wanted to do traditional PAR can lights mounted between the floor joints but quickly found that they would not line up in any way shape or form with the drop ceiling grid. I ended up going with surface mount 13W LED discs so that I could center the lights on the ceiling tiles. The lights that I used were designed to be mounted in a 4 inch round junction box. Some of the junction boxes needed to span between floor joists with hanger bars while others landed directly over and were screwed directly into a joist.


Here are the finished cabinets and the whole room right before the carpet went in. I had an old mini fridge that I wanted to use instead of buying a new one to fit in a 24" space. In order to keep the fridge off the floor and provide an edge for the carpet in that spot, I made a small box with a plywood top to fill in the toe kick space as if there was a cabinet in that position.

I did a little trick with the upper cabinets that you probably would never notice. I wanted to use a free standing microwave that I already had laying around instead of purchasing a built-in, over-the-range model. Furthermore, built ins have lights and exhaust fans on the bottom that would be redundant here. Even though the microwave that I had was fairly small, it was still deeper than would fit in the microwave cubbie that I was making. It would have stuck out quite a bit from the front of the cabinets. To get around this, I held the upper cabinets out from the wall 1.5 inches farther than normal by attaching a doubled up strip of 3/4" plywood to the top and bottom of each cabinet before installation.
Attached Thumbnails
Click image for larger version

Name:	IMG_20160613_214700.jpg
Views:	282
Size:	92.1 KB
ID:	2360352   Click image for larger version

Name:	IMG_20160628_194733.jpg
Views:	295
Size:	119.7 KB
ID:	2360354   Click image for larger version

Name:	IMG_20160704_214920.jpg
Views:	281
Size:	118.5 KB
ID:	2360356   Click image for larger version

Name:	IMG_20160719_193737.jpg
Views:	282
Size:	71.1 KB
ID:	2360358   Click image for larger version

Name:	IMG_20160719_193832.jpg
Views:	287
Size:	80.6 KB
ID:	2360360  


Last edited by AlienWarlock; 03-04-2018 at 10:09 PM.
AlienWarlock is offline  
post #17 of 26 Old 02-13-2018, 06:27 AM
AVS Forum Special Member
 
Ladeback's Avatar
 
Join Date: Apr 2015
Location: Kansas City
Posts: 2,432
Mentioned: 71 Post(s)
Tagged: 0 Thread(s)
Quoted: 1321 Post(s)
Liked: 469
Send a message via MSN to Ladeback
I just noticed you didn't put any insulation in the joist above your ceiling tiles. Are the tiles enough to stop sound from heard from above?

Klipsch KPS-400’s FR/FL with built in 15” 300 watt side firing subs, RC-7 Center, RS-3 Surrounds.
Integra DHC-60.5, 5- Marantz MA700 Mono Blocks, Pioneer DV-F727 301 Disk DVD CD Changer, Pioneer DVL-909 Laserdisc/DVD/CD Player, Sony PS3.
https://www.avsforum.com/forum/19-ded...ck-cinema.html
Ladeback is offline  
post #18 of 26 Old 03-01-2018, 08:08 PM - Thread Starter
Member
 
AlienWarlock's Avatar
 
Join Date: Oct 2017
Posts: 40
Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 9 Post(s)
Liked: 16
Quote:
Originally Posted by Ladeback View Post
I just noticed you didn't put any insulation in the joist above your ceiling tiles. Are the tiles enough to stop sound from heard from above?
Hello. The ceiling tiles do help a little bit with sound absorption. But to answer your question, the sound can definitely still be heard from above. It really isn't a problem for my situation anyway.
AlienWarlock is offline  
post #19 of 26 Old 03-01-2018, 09:01 PM - Thread Starter
Member
 
AlienWarlock's Avatar
 
Join Date: Oct 2017
Posts: 40
Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 9 Post(s)
Liked: 16
Chapter 8 - The Penultimate Chapter

So now we are quickly reaching the end of this build retrospective. I thought I would do one more post focusing on the equipment rack before the final reveal. So here is a picture of the finished equipment rack:


Equipment:
Monoprice MPR-SG6Z whole house audio (2 of these)
Rolls RS81 AM/FM tuner
Yamaha RX-V863 receiver
Oppo BDP-103 Blu-ray player
Middle Atlantic DVD rack shelf
Kaleidescape M700 disc vault
Kaleidescape 1U server
Middle Atlantic 2U drawer
APC SmartUPS C 1000

And here is the back of the rack inside the electronic shop:


I used my old rack next to the main rack to hold a bunch of random other stuff like the TiVos, Xbox, security DVR and what not. I probably need to get rid of at least half of it, but for now it all works! And maybe I should also paint the 2x2 braces at the back of the rack, how embarrassing!

The back of the main rack:


I made good use of a pack of Middle Atlantic cable lacing bars and several rolls of Velcro here.

The patch panel:


There is lots of stuff going on here. In the middle is the networking rack with 24 port Ubiquiti EdgeSwitch, EdgeRouter lite and cable modem. On the left is the VeCoax ATSC modulator, Raspberry Pi for home automation, and various connections for the whole house audio. On the right is the box containing the coax distribution amps and next to that is a bluetooth to POTS phone adapter with 110 splitter block (an ode to voice).

And finally a closeup of the raspberry pi:


I am running a raspberry pi 2 with openHab for home automation. The white USB stick is the z-wave radio. The circuit board is an IR receiver and transmitter along with some various relays connected to the pi. Above that are the keypad connections to the Monoprice whole house amps along with a Bluetooth audio receiver.
Attached Thumbnails
Click image for larger version

Name:	IMG_20180228_204616.jpg
Views:	205
Size:	138.2 KB
ID:	2368860   Click image for larger version

Name:	IMG_20180228_204802.jpg
Views:	203
Size:	166.5 KB
ID:	2368868   Click image for larger version

Name:	IMG_20180228_204817.jpg
Views:	298
Size:	202.0 KB
ID:	2368870   Click image for larger version

Name:	IMG_20180228_205053.jpg
Views:	206
Size:	134.3 KB
ID:	2368872   Click image for larger version

Name:	IMG_20180228_204906.jpg
Views:	203
Size:	163.4 KB
ID:	2368874  

LydMekk and Ladeback like this.

Last edited by AlienWarlock; 03-01-2018 at 10:05 PM.
AlienWarlock is offline  
post #20 of 26 Old 03-02-2018, 03:45 AM
AVS Forum Special Member
 
Ladeback's Avatar
 
Join Date: Apr 2015
Location: Kansas City
Posts: 2,432
Mentioned: 71 Post(s)
Tagged: 0 Thread(s)
Quoted: 1321 Post(s)
Liked: 469
Send a message via MSN to Ladeback
DANG, that's a nice clean wife job. Mine is a big mess and I need to clean it up sometime, but I don't have as much stuff as you do coming in.

Klipsch KPS-400’s FR/FL with built in 15” 300 watt side firing subs, RC-7 Center, RS-3 Surrounds.
Integra DHC-60.5, 5- Marantz MA700 Mono Blocks, Pioneer DV-F727 301 Disk DVD CD Changer, Pioneer DVL-909 Laserdisc/DVD/CD Player, Sony PS3.
https://www.avsforum.com/forum/19-ded...ck-cinema.html
Ladeback is offline  
post #21 of 26 Old 03-02-2018, 06:51 AM
AVS Forum Special Member
 
OJ Bartley's Avatar
 
Join Date: Apr 2009
Location: Toronto, ON
Posts: 1,116
Mentioned: 13 Post(s)
Tagged: 0 Thread(s)
Quoted: 460 Post(s)
Liked: 552
Very impressive work. I'm truly envious of you guys who can put together networks like that and have everything work properly. I have a 48 port switch that I'm planning to use to distribute Cat6 throughout my house, and I'm basically just hoping for the best when it does come time for installation. Lol. Also, a theatre, woodshop, AND electronics shop!? What an awesome basement.
OJ Bartley is offline  
post #22 of 26 Old 03-04-2018, 05:13 PM - Thread Starter
Member
 
AlienWarlock's Avatar
 
Join Date: Oct 2017
Posts: 40
Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 9 Post(s)
Liked: 16
Hello and thanks for your comments. Good luck on running your CAT 6. My best advice there is to get a reputable box of cable from a big box store or data comm distributor. Be wary of inexpensive category cable from online retailers. Also watch out for inexpensive patch panels too!
AlienWarlock is offline  
post #23 of 26 Old 03-11-2018, 01:23 PM - Thread Starter
Member
 
AlienWarlock's Avatar
 
Join Date: Oct 2017
Posts: 40
Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 9 Post(s)
Liked: 16
Chapter 9 - Finished!

The view from the front row:




Looking back:
The "SHOW" shadow box has real marquee letters and actual 35mm movie trailer print film inside.
The Dolby and DTS signs were found on ebay.


The door to the woodshop:


The snack bar:
I found the drive-in speakers at a flea market.
The 8mm projector came from a thrift store and the movie trailer prints came from an antique market.


The art work is from 'The Cue Dot' project by Taylor Umphenour.
The candy tray was purchased on ebay from seller 'hmreco' item# 1133-1ACLE (16" wide acrylic 3 tier counter top display rack)









THE END
Attached Thumbnails
Click image for larger version

Name:	1IMG_20180228_205623.jpg
Views:	150
Size:	136.7 KB
ID:	2373664   Click image for larger version

Name:	2IMG_20180228_203020.jpg
Views:	144
Size:	144.6 KB
ID:	2373666   Click image for larger version

Name:	3IMG_20180228_203133.jpg
Views:	266
Size:	124.9 KB
ID:	2373668   Click image for larger version

Name:	4IMG_20180228_203600.jpg
Views:	142
Size:	157.0 KB
ID:	2373670   Click image for larger version

Name:	5IMG_20180228_204120.jpg
Views:	148
Size:	132.7 KB
ID:	2373672  

Click image for larger version

Name:	IMG_20180228_203632.jpg
Views:	145
Size:	152.3 KB
ID:	2373674   Click image for larger version

Name:	IMG_20180228_203717.jpg
Views:	147
Size:	148.7 KB
ID:	2373676   Click image for larger version

Name:	IMG_20180228_204133.jpg
Views:	138
Size:	138.7 KB
ID:	2373678   Click image for larger version

Name:	IMG_20180228_204629.jpg
Views:	149
Size:	160.0 KB
ID:	2373680  
BllDo and femi like this.
AlienWarlock is offline  
post #24 of 26 Old 05-01-2019, 07:16 PM - Thread Starter
Member
 
AlienWarlock's Avatar
 
Join Date: Oct 2017
Posts: 40
Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 9 Post(s)
Liked: 16
Well its been over a year, so time for a small update. I did upgrade a few components over the year, so here are some new pictures:




The biggest changes were the addition of the Monolith 10" 500 Watt Powered Subwoofer and the replacement of the Monoprice WHA with a Nuvo Essentia E6G and expander. A big shout out to @Bobone and everyone in the Nuvo modernization thread!

(https://www.avsforum.com/forum/36-ho...servation.html)


I also moved a few things in the rack around by removing the DVD holder, adding a K-5000 player for music, adding a blank panel with the theater name in vinyl letters and also adding a Middle Atlantic custom rack shelf for the Tivo.


But I had the most fun customizing my TV cabinet upstars in the Exascale Lounge:





It was just a fairly plain cabinet with one single shelf behind the doors and the components haphazardly stacked inside. There was no before picture taken . I used a set of Middle Atlantic BRK 12 rack rails cut down to just over 11U tall to create a rack inside the cabinet. The rails were attached to 1/2" plywood strips (6" wide) that were edge banded and stained to match the cabinet and then pocket screwed to the top and bottom of the cabinet. I used a couple 1U blank panels during installation to keep the 19" spacing consistent. The end result was 10U of usable rack space inside the cabinet:







So from top to bottom I have:
APC SC-450 UPS
M500 Player
Homemade 1U rack mount 4-way RCA selector switch
Nuvo Ipod dock, Xbox original & Logitech BT Audio receiver
Sony 5 disc CD changer
SNES & NES mini w/ manual A/B HDMI switch


The selector switch feeds Source 3 of the Nuvo WHA via a Cat5 balun down to the main rack with whatever input is selected. I also used 1/2" wide aluminum strips painted black to cover the empty screw holes above the Xbox and CD changer shelves.






For my next upgrade, I am considering getting an A-Lens and CinemaScope screen, so I might have a couple of questions on that later.
Attached Thumbnails
Click image for larger version

Name:	IMG_20190501_194509.jpg
Views:	158
Size:	138.3 KB
ID:	2561258   Click image for larger version

Name:	IMG_20190501_193510.jpg
Views:	154
Size:	166.2 KB
ID:	2561260   Click image for larger version

Name:	IMG_20190501_193745.jpg
Views:	156
Size:	207.6 KB
ID:	2561262   Click image for larger version

Name:	IMG_20190501_193808.jpg
Views:	53
Size:	161.2 KB
ID:	2561264  
Bobone, Ladeback and femi like this.

Last edited by AlienWarlock; 05-01-2019 at 09:37 PM.
AlienWarlock is offline  
post #25 of 26 Old 05-02-2019, 07:23 AM
Senior Member
 
Join Date: Mar 2017
Location: Birmingham,Alabama
Posts: 226
Mentioned: 13 Post(s)
Tagged: 0 Thread(s)
Quoted: 103 Post(s)
Liked: 137
Nice clean work. This is quite a man cave. Woodshop, Electronics shop, theater, etc. Very nice.

Quote:
Looking out from the wood shop under the stairs.
HA! Another owner of a Craftsman Zip Code saw! I have that same model (the 22114). That saw and it's big brother, the 22124, were basically the only high quality machines that Craftsman made in the last 30 years - and predictably, they were made by Steel City's Orion division. But they are smooth running really great table saws. I lucked into mine for $400 along with a big pile of Cherry and Maple lumber and a Ridgid oscillating sander. The guy was quitting woodworking and had made small custom projects. I replaced the fence on mine with an Incra but other than that it has been a true workhorse - in fact this past weekend I took it all apart and got everything aligned within .001"- I have never felt the need to upgrade and I've used Powermatics and Unisaws along with my buddy's SawStop. Though I admit that SawStop is one helluva machine...

EDIT: I just noticed your Harbor Freight dust collector with Wynn canister filter - crazily enough I have the same setup. If you've got an Oneida Super Dust Deputy hiding behind that corner we might be long lost twins lol

Roll Tide.
p3bham is offline  
post #26 of 26 Old 05-02-2019, 07:29 AM
Member
 
toddwz's Avatar
 
Join Date: Aug 2016
Posts: 93
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 42 Post(s)
Liked: 26
Exascale, that's a big word. I wonder what your occupation is.
toddwz is offline  
Sponsored Links
Advertisement
 
Reply Dedicated Theater Design & Construction

Thread Tools
Show Printable Version Show Printable Version
Email this Page Email this Page


Forum Jump: 

Posting Rules  
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off