Cost to finish basement - Page 3 - AVS Forum | Home Theater Discussions And Reviews
Forum Jump: 
Reply
 
Thread Tools
post #61 of 62 Old 01-29-2009, 07:32 AM
AVS Forum Special Member
 
Ericthemidget's Avatar
 
Join Date: Jan 2008
Posts: 1,406
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 100 Post(s)
Liked: 48
I live in the Philadelphia suburbs and my basement is coming in at $9800. This includes framing, electrical, drywall, custom book shelves and dvd shelves, and molding. Price does not include carpet, paint, or av equipment. Total time for construction is about 3 weeks.

Ericthemidget is offline  
Sponsored Links
Advertisement
 
post #62 of 62 Old 06-07-2009, 11:29 PM
Newbie
 
Barkri12's Avatar
 
Join Date: Apr 2009
Posts: 1
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Liked: 10
Basement waterproofing is a must for every home that has a basement. Your major objective is to prevent leaks from creating puddles or completely flooding your basement floor. Flooding though is not the real danger in basements without a waterproofing system. In most cases, water can seep into the basement in small amounts without you even noticing.Last 3months ago i have experienced of basement remodeling through Value Dry Expert.
Barkri12 is offline  
Sponsored Links
Advertisement
 
Reply Dedicated Theater Design & Construction

Thread Tools
Show Printable Version Show Printable Version
Email this Page Email this Page


Forum Jump: 

Posting Rules  
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off