Elemental Designs A2-300
Quote:
Originally Posted by OhioMike /forum/post/14134874
The eD's can take 2-4 weeks. I would suggest the A3-300 ($499) if you go eD, a little more power won't hurt in the larger space.
If you need the sub a little quicker, look at the SVS PB10 NSD ($429) and HSU VTF2 MK3 ($499), shipping cost will put the HSU a bit over budget, but it is an excellent sub.