OK, so I am trying to make the best of what I have going.  I am about to completely finish my basement and I am looking to add a bedroom (for resale) a 3/4 bath and a family media room.

 

This is what I am currently looking at.  I really can't move the bedroom much because that is where the egress window is at and the bathroom is pretty set since it is roughed in.

 

 

I am thinking about a general purpose family room with a small bar and a fridge.  I am planning on decoupling in the media room area and possibly putting in a projector.  I know that my current layout isn't ideal, but at least I can close off the area.  the couch positions are pretty nominal.

 

I have spent a lot of time trolling the forums and I was hoping to get a second set of eyes (or a hundred) to see if there is something I am missing.

 

Thanks in advance for the help.

 

Chris
 

·
Registered
Joined
·
306 Posts

How tall are your ceilings?  Where will you be putting your screen?  Are there any windows in that media room?  Do you have room in the mech room walls facing the media room to put in a built in rack?

 

Other things to consider:  electrical usage (do you have empty slots on your panel), HVAC (if you're making that room airtight, you'll need separate HVAC setups), riser/stage (are you adding these and where).

 

Depending on how much you're spending, did you consider going through one of the dedicated theatre design guys here on AVS?

 

Good luck!!!!!  That's going to be a lot of work.
 

·
Registered
Joined
·
61 Posts
Discussion Starter · #3 ·



 

Sorry for the delay, I have been trying to figure out this framing thing, so far I have the wall just north of my stairwell framed in.  Hopefully I will get a bit faster as I get the hang of it.

 

The basement is 8' ceilings except I will have to have a soffit running the length where I will lose a foot of headroom.

 

I'm sure I have room in the mech room to carve out rack space.  I have a sump pump in the upper left corner that could be framed larger for the rack, or I could build into a closet that I have to enclose my electrical panel in the lower left.

 

I am in the military, so I know I won't be in this house for more than 3-4 years, so that means I might not get that dream theater room.  I just don't think I would get that money back on resale.  I would like to put in enough sound deadening so that I don't wake up the kids who will be sleeping 2 floors above when I watch a movie.  Something that I can't do now in my open living room

 

I have 6-7 open panels in my electrical box so I think that I should be good on that front.  
 

·
Registered
Joined
·
61 Posts
Discussion Starter · #4 ·

Here is a pic of the slow progress.

 

I have also attached a few pics of the proposed media/family room.  I might have to clear it out a bit before I get that far. 

 



 

 

·
Registered
Joined
·
61 Posts
Discussion Starter · #5 ·

Alright, the going is slow but I am making some progress.  I am just about finished with my framing and I could use some opinions from the experts.

 

My biggest question is what wall to put my projector screen on.  It looks like the 2 options are on the west wall next to my electric panel or on the south wall.  I am planning on putting a wet bar on the north wall (its the only place that I can plumb it).   The entire north portion of the rec room L has a shorter ceiling due to a soffit, it is only about 78 inches tall there.  My sump pump is on the left of the proposed bar area, I am planning on framing it in and using the area on top of it to house my rack space.

 

 I would also like to find a place to put my old 50 inch plasma where it can be seen next to the projector screen for college football.

 

I have attached a new version of the floorplan and a few photos, thanks in advance for any advice.



 

 

·
Registered
Joined
·
61 Posts
Discussion Starter · #6 ·

I'm not sure anyone is following but here is my update.  I have been traveling quite a bit for work so progress has been sporadic.

 

First a safety message, be careful when using big drills to drill plumbing holes.  I had the drill kick back on me and I have been sporting this shiner for the past 2 weeks.



 

OK here is the basement.  I now have more motivation to get it done since I pulled the trigger on a Benq w1070 that will be here next week.  Here is my potential office/treadmill room.  Plenty of network drops and a dedicated circuit in case I put a treadmill in there.  I also routed an HDMI from my rack location behind the theater.



 

Bathroom, I still need to route the supply lines and finish framing out the front wall once I get the shower in.



 

Here is the bedroom and closet.  I don't have a need for a fifth bedroom but I figured it would be good for resale.  I decided to put  french doors leading in so that I can let in some daylight (one of 2 windows in the basement) and have it almost be an extension of the media/theater room.  HDMI and network in here also.



 

:Here is my screen wall, I am going to mount the projector in the soffitt overhead.  It is looking like I am getting a 92-97 inch screen with a seating distance of about 9 feet.  I also ran HDMI to where you could put TV in the front and an HDMI to the left in case I get crazy and put up a flat screen for a second screen for college football days.



 

Here is the back wall of the theater nook. I have all of my HDMI from the basement routed here, my intent is to build the rack area above the sump pump.  The area to the right will be a wet bar where I will put a fridge (kegerator).  I am thinking about a 7.1 system using in wall/ceiling speakers for the rear and I just bought some Andrew Jones pioneer towers and center for the front.  I will probably have to get a new subwoofer once I get closer to completion.



 

I still have a lot of work to do, but the goal is to have it done before college football season.  I have all of my lights and outlets placed but I still need to route the romex throughout.  
 

·
Registered
Joined
·
306 Posts

Nice progress!!!!!  Looks like you're approaching the drywall stage soon.  I'd recommend farming that out.
 

·
Registered
Joined
·
61 Posts
Discussion Starter · #8 ·
Funny you should say that, I was just looking up h ow tough it would be to do it myself and I think it would be worth it to pay for the taping and mudding. I already bought the drywall lift and I am planning on paying the delivery charge to get the sheets to the basement.


Progress has slowed a bit due to work and vacation. Im taking tomorrow off of work to flood my basement, I mean to turn off the water and connect the plumbing supply lines.
 

·
Registered
Joined
·
733 Posts

Quote:
Originally Posted by GonzoNerd  /t/1522310/gonzonerds-basement-build#post_24792421


Funny you should say that, I was just looking up h ow tough it would be to do it myself and I think it would be worth it to pay for the taping and mudding. I already bought the drywall lift and I am planning on paying the delivery charge to get the sheets to the basement.

This is the way to go. Check to see if the contractor provides the mud or if you do....Also, can you save some money doing your own cleanup? It's a pain, but not nearly as tedious as mudding/taping yourself.
 

·
Registered
Joined
·
1,097 Posts
Looking good.


I am at the drywall stage myself. Hasn't been started just yet. I had someone lined up to do it all for me (I buy the drywall) but right now I just don't have the lump sum of cash on hand so I'm thinking about just starting the drywall little by little. But for sure I will pay to have someone tape and mud and hopefully clean up.
 

·
Registered
Joined
·
61 Posts
Discussion Starter · #11 ·

Well, I didn't flood the basement.  But why would they ship a shower valve in the on position?  I got the supply lines in the bath, the wet bar sink, and I ran a cold water line for an ice maker for the fridge.

 

It was a busy social weekend so I didn't have as much time in the basement as I would have liked.  I did get some recessed lighting wired in.  Its my first time working with LEDs, it was tough spending $14 per light bulb but I think they look pretty nice.  I am still going to pay someone to hook up my circuits to the breaker box, I used the existing basement circuit to power the lights.

 

In the viewing area I am trying to get the lutron IR dimmer working.  I don't think I have enough wattage on  the circuit right now.  The LEDs will dim but they won't turn all of the way off.  Still under investigation but it would be cool to have lights dim when I press play on the movie.

 

Here is the only photo I took.

 

 

·
Registered
Joined
·
142 Posts

Quote:
Originally Posted by BasementHT5  /t/1522310/gonzonerds-basement-build#post_24792307


Nice progress!!!!!  Looks like you're approaching the drywall stage soon.  I'd recommend farming that out.

Best money I've spent on my build. Drywallers loaded and hung all of the drywall in mine in one day - very impressive!
 

·
Registered
Joined
·
61 Posts
Discussion Starter · #13 ·

It didn't take much convincing from you guys, but I have decided to hire a drywaller to tape and mud for me.  I already bought a drywall lift so I have committed myself to hanging it myself when the time comes.

 

I still have a few more things to do:

- Finish running electric and connect to breaker box

- Connect boots to 3 HVAC supply runs

- Hook up the drain for the bar sink

- Minor framing (drywall blocking, reinforce the half wall to basement, frame out dvd rack and av rack)

- Fireblock

- Insulation

 

But some of these will have to wait.  As I was cleaning up downstairs I noticed that there was a wet spot under my bar area.  I had a slow leak from one of my connections.  So I put the kids to bed and now I am waiting for the CPVC glue to dry before I turn the water back on.  I had a workout before all of this and I really need a shower so I hope there aren't any leaks.
 

·
Registered
Joined
·
61 Posts
Discussion Starter · #14 ·
OK, small update. A week long family vacation really slows progress.

I have decided that I need to finish all of the little framing bits that I have been neglecting in order to get the saw and wood scraps out of the way down there.

I was working on framing out my dvd storage and AV rack when I came to the realization that I didn't have a very good plan on how I wanted the final product to look like. My AV rack is going to be above my sump pump, so I need to build in some kind of access to it. Do I cover the edges in sheetrock or painted or stained plywood? The fridge is going just to the right of the rack, but maybe I can put some removeable panels on the right to help wire everything up and grant access to the sump pump? I would love to have a fancy pre built rack that can pull out but I can't justify the expense on a house that I am not going to live in for that long. Any ideas would be appreciated.

DVD rack to left and AV/sump pump to right
Wall Room Building insulation Floor Electrical wiring


AV rack/sump pump front
Room Electrical wiring Wood Bathroom Plumbing


Side view of AV rack/sump pump
Wall Room Wood Furniture Electrical wiring
 

·
Registered
Joined
·
61 Posts
Discussion Starter · #15 · (Edited)
A small progress update. I am under the impression that I am done with framing so I have removed all of my scrap lumber and folded up my saw until trim work.

I cut down the wall next to the stairwell to make a half wall and open it up a bit. The bottom of the wall had way too much play in it so I did the following modifications. I probably have about 5 ramset nails in the floor plate and I don't know how many screws in there. It might not be pretty but that wall aint moving now.

Room Wall Floor Basement Attic


I also finished up my HVAC work by putting in some returns through my soffit.

Beam Wall Ceiling Floor Building


Finally I have cut the hole in the soffit for the projector to live in, I will test fit it a bit later tonight.

Beam Ceiling Wood Room Wood stain


Oh, and don't judge the electrical wires. I still have a bunch of electric work before this project is done.
 

·
Registered
Joined
·
61 Posts
Discussion Starter · #16 ·
Alright, progress is being made. I have completed everything on my punch list and as far as I know I am ready for my mechanical inspection. The inspectors will be coming over tomorrow at noon.

I also had 100 sheets of drywall delivered today.

I will post some pics tomorrow of the pre drywall stage.
 

·
Registered
Joined
·
61 Posts
Discussion Starter · #17 ·
OK, the plumbing inspection went fairly well. I have about 20 minutes of work to do to get to where I need to be. I'm considering that a win. I'm waiting for the next inspector while I am typing this.

Here are some pics of the current state.

The stairwell got dinged up a bit getting the sheetrock down, I'm ok with it because I didn't have to carry it.
Wall Ceiling Room Plaster Floor


Here is the first stack of sheetrock, this is the 1/2 for most of the walls.
Wood Floor Hardwood Plywood Flooring


Here is stack 2, this is the 5/8 for the ceiling and my new toy that will hopefully help the installation process.
Room Property Wall Floor Building


Here is a shot of some of the fireblocking that I put up. For most of the walls I went with the insulation method.
Ceiling Room Beam Attic Building insulation


And a shot of where I had to re route all of my coax to my unfinished mech room.
Room Wall Ceiling Beam Basement
 

·
Registered
Joined
·
55 Posts
looks nice! what's all the coax for?
 

·
Registered
Joined
·
1,097 Posts
Looking good! I can't wait to see how the drywall goes. I am close to starting to hang my own drywall hopefully in the next few weeks. I know how I did the ceiling I'm going to have a "fun" time getting it hung. Oh well I'll get the job done. I will definately be renting a lift for that job! I have been debating on going with 5/8 for the ceiling. Is there a big benefit to using that apposed to 1/2 inch? I would think it could help for sound.

P.S. Just looking through your layout pictures and it's funny how similar the rough layout of your basement is to mine. It's cool to see how other people tackle a similar setup.
 

·
Registered
Joined
·
61 Posts
Discussion Starter · #20 ·
Looking good! I can't wait to see how the drywall goes. I am close to starting to hang my own drywall hopefully in the next few weeks. I know how I did the ceiling I'm going to have a "fun" time getting it hung. Oh well I'll get the job done. I will definately be renting a lift for that job! I have been debating on going with 5/8 for the ceiling. Is there a big benefit to using that apposed to 1/2 inch? I would think it could help for sound.

P.S. Just looking through your layout pictures and it's funny how similar the rough layout of your basement is to mine. It's cool to see how other people tackle a similar setup.
I'm hoping that the 5/8 is a bit better with sound but the primary reason that I went with it is that it is supposed to dash less with studs on 24 inch center which is what I did in my soffit area. It's also supposed to be a bit better at staying level with stud inconsistencies.

Porpie, all of the coax to all of my drops and my satellite and internet were routed into the house right next to my electrical panel. I decided to reroute all of them to the same place that all of my network cable terminates.
 