Tomorrow morning I am having the granite installed on my bar. The plan is to have the kegerator in the unfinished basement and run the line to the finished part. The installers are going to drill a hole in the granite for the keg tower.
I have seen some pictures and I am wondering how everyone has installed their towers? My wise co-worker suggested drilling holes in the granite for screws to go through and than just bolting the screws down on the other side. Is this the best idea or am I missing something?
Thanks in advance.
I have seen some pictures and I am wondering how everyone has installed their towers? My wise co-worker suggested drilling holes in the granite for screws to go through and than just bolting the screws down on the other side. Is this the best idea or am I missing something?
Thanks in advance.