Joined
·
21 Posts
And so it begins. Here are the before pics. The first 3 phases will not really be that exciting:
Phase 1: Electrical Panel & Service
Phase 2: Replace Plumbing Drainage Lead pipes with PVC.
Phase 3: Waterproofing & Sump
Phase 4: Insulation/Framing/Walls/Doors..etc
Phase 1: Electrical Panel & Service
Phase 2: Replace Plumbing Drainage Lead pipes with PVC.
Phase 3: Waterproofing & Sump
Phase 4: Insulation/Framing/Walls/Doors..etc