Joined
·
235 Posts
Room is studded out, except for the proscenium. Should be ready for drywall late this month. It's built in the basement, on concrete slab (hydronic heat in slab, forced air AC in ceiling). Built a plywood riser over the slab for better bass response. Pics and plans are in the Members Photo Gallery, under Construction. Equipment list is in the What's Your System Configuration section. When my wife redoes our website, I'l post some 360 degree pictures.
Seth
Seth