AVS Forum banner
1 - 2 of 2 Posts

·
Registered
Joined
·
685 Posts
Discussion Starter · #1 ·
Did you guys caulk the first layer and the second layer? Just the first? Just the second? Did you tape and spackle after the first? My biggest gaps after the first layer of sheet rock are between the floor and sheetrock. I would estimate that each wall could probably take a 1/2 to 1 tube. I assume I gotta fill this gap now?
 

·
Registered
Joined
·
7,780 Posts
You should try and keep all drywall joints tight on both layers.


Fill any obvious gaps as you go with sealant. This includes the floor / wall intersection.


There is no need to mud and tape the first layer.
 
1 - 2 of 2 Posts
Top