AVS Forum banner
1 - 10 of 10 Posts

·
Registered
Joined
·
40 Posts
Discussion Starter · #1 ·
Finally decided on my setup for the sports room but unsure what to run for wiring


2 50' plasmas and a panasonic 2000u projector.


hdmi, component video to the projector


hdmi, component video, outdoor hdtv antenna, to the plasmas


Is this overkill or not enough


Thanks
 

·
Registered
Joined
·
984 Posts

Quote:
Originally Posted by rardijoh /forum/post/14186481


Finally decided on my setup for the sports room but unsure what to run for wiring


2 50' plasmas and a panasonic 2000u projector.


...


Is this overkill or not enough


Thanks

Two fifty foot plasmas is definitely overkill.
 

·
Registered
Joined
·
897 Posts

Quote:
Originally Posted by turt /forum/post/14187487


Two fifty foot plasmas is definitely overkill.

This guy (note: this is not my setup) would beg to differ:




--Mav
 

·
Banned
Joined
·
98 Posts
I would run a few additional pieces of cat5e to each display as well. Down the road if you decide on a control system or additional video those extra runs make the installation more flexible.
 

·
Registered
Joined
·
2,880 Posts

Quote:
Originally Posted by Matt Natale /forum/post/14188857


I would run a few additional pieces of cat5e to each display as well. Down the road if you decide on a control system or additional video those extra runs make the installation more flexible.

Agreed. Also, are you going to run sound to the plasmas or are you using separate speakers?


CJ
 

·
Registered
Joined
·
2,880 Posts
I'm not sure I understand your answer! In any case, it would probably be a good idea to run a pair of RCA cables to both plasmas in case you do ever want to use their built-in speakers!


CJ
 

·
Registered
Joined
·
896 Posts

Quote:
Originally Posted by Matt Natale /forum/post/14188857


I would run a few additional pieces of cat5e to each display as well. Down the road if you decide on a control system or additional video those extra runs make the installation more flexible.

Smart. I don't know now many times clients said "no" to this during the design phase, then came back a year later and wanted it pulled in. At least provide an easy pathway.


Frank
 
1 - 10 of 10 Posts
Top